My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0011960
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
S
>
STANISLAUS
>
1252
>
3500 - Local Oversight Program
>
PR0545699
>
ARCHIVED REPORTS_XR0011960
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2020 10:05:04 AM
Creation date
5/28/2020 9:57:17 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0011960
RECORD_ID
PR0545699
PE
3528
FACILITY_ID
FA0010903
FACILITY_NAME
CSU STANISLAUS MULTI CAMPUS REGIONA
STREET_NUMBER
1252
Direction
N
STREET_NAME
STANISLAUS
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13921008
CURRENT_STATUS
02
SITE_LOCATION
1252 N STANISLAUS ST
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCSA—University Park <br /> Site Background . <br /> Page 3 <br /> quantified as kerosene (TPH-K), MTBE, and 1,2-DCA were detected in the groundwater sample collected <br /> from monitor well MW-3 at concentrations generally consistent with historical results. The groundwater <br /> gradient direction (northeast) was similar to the gradient direction measured during the soil and <br /> groundwater investigation activities conducted on December 18,2001 (slightly north of east), <br /> Condor prepared a Problem Assessment Work Plan (PAWP) dated January 23, 2003, to describe <br /> additional groundwater investigation at the site.-The PAWP was"prepared at the request of Mr. David- <br /> Rosso for the Trustees of the California State University in response to a letter dated April 26;2002 from <br /> Ms. Setliff of the SJCEHD. The purpose of the proposed work is to further.investigate the lateral and <br /> vertical extent of petroleum hydrocarbon contamination in groundwater at the site. As requested by the <br /> SJCEHD, the PAWP also included a remedial feasibility evaluation that compared and discussed remedial <br /> techniques for site remediation. <br /> Condor prepared a Soil and Groundwater Remediation Work Plan, dated March"3, 2003, at the request of <br /> Mr. David Rosso for the Trustees of the California State University. The scope of work described in this <br /> work plan includes (1)groundwater dewatering with dewatering wells, groundwater treatment, and proper <br /> disposal of treated groundwater; (2) soil over-excavation, including transport and disposal of <br /> contaminated soil; and(3) in-situ groundwater remediation utilizing ozone sparging technology. <br /> Nuel Henderson of the SJCEHD approved the PAWP in a letter dated March 27, 2003. Mr. Henderson <br /> also approved the soil over-excavation portion of the Soil and Groundwater Remediation Work Plan"as an <br /> interim remedial measure. However, Mr. Henderson also indicated that ozone sparging would not be <br /> considered by the SJCEHD until site characterization was complete. <br /> " On March 13, 2003, a Condor representative was on site to measure water levels and collect water <br /> samples from the three monitor wells. A slight petroleum odor was noted in the field inspection samples <br /> collected from MW-2 and MW-3. The laboratory analytical" results.indicated that no petroleum <br /> hydrocarbon constituents were detected in'the groundwater sample collected from monitor well MW-1. <br /> BTEX, TPH-G, total petroleum hydrocarbons quantified as diesel and motor oil (TPH-D, MO) and 1,2- <br /> DCA were detected in the groundwater sample collected from monitor well MW-2. BTEX, TPH-G,-total <br /> petroleum hydrocarbons quantified as diesel (TPH-D), MTBE, and 1,2-DCA were detected in the <br /> k groundwater sample collected from monitor well MW-3 at concentrations generally consistent with <br /> historical results. The groundwater gradient direction (southeast) was generally consistent with historical <br /> groundwater gradients. <br /> On April 14 through 17,2003, Condor conducted an additional groundwater investigation at"the site using <br /> direct push boring methods. Condor supervised the completion of five deep CPT boring pairs and one <br /> shallow hydropunch boring. Findings of the work were described in the Additional Groundwater <br /> Investigation Report, dated August 19, 2003, prepared by Condor. Based on the laboratory analytical <br /> .results of the groundwater samples, the extent of groundwater contamination is adequately investigated <br /> " up-gradient and cross-gradient at the site. In addition, all petroleum hydrocarbon constituents other than <br /> TPH-D and 1,2-DCA (including BTEX and MTBE) are very limited in extent, laterally and vertically, in <br /> the down-gradient direction. Condor recommended the installation of additional monitor wells at the site <br /> to investigate and monitor deep groundwater in the source area and shallow and deep groundwater in the <br /> _ down-gradient portion of the site. Condor also reaffirmed its recommendation for soil over-excavation" <br /> and ozone sparging in the source area.. However, Condor recommended that any further work not be <br /> conducted at the site until the site disposition, relative to.soil over-excavation and the demolition of the <br /> site structures,was decided. <br /> h <br />
The URL can be used to link to this page
Your browser does not support the video tag.