My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0011960
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
S
>
STANISLAUS
>
1252
>
3500 - Local Oversight Program
>
PR0545699
>
ARCHIVED REPORTS_XR0011960
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2020 10:05:04 AM
Creation date
5/28/2020 9:57:17 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0011960
RECORD_ID
PR0545699
PE
3528
FACILITY_ID
FA0010903
FACILITY_NAME
CSU STANISLAUS MULTI CAMPUS REGIONA
STREET_NUMBER
1252
Direction
N
STREET_NAME
STANISLAUS
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13921008
CURRENT_STATUS
02
SITE_LOCATION
1252 N STANISLAUS ST
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i Fourth Quarter 2004 Quarterly Groundwater Monitoring Report <br /> Stockton Center Site Authority—University Park <br /> { January 10,2005 <br /> 4 Page 5 of 6 <br /> evaluation of site source area remediation by pilot testing of air_sparging in combination with soil vapor <br /> extraction in a work plan dated September 15, 2004. In a letter dated November 8, 2004, Mr: He <br /> of the SJCEHD expressed concern with two aspects of the proposed approach and requested submittal of <br /> a work plan addendum by January 17; 2005,'addressing his concerns. Concurrently, site development <br /> plans continued to evolve such that a structure planned for the site vicinity was to.be located well away <br /> from the site contaminant source area and that a parking lot for the structure would be built over the site <br /> source area. These considerations indicated the potential for ,consideration of less aggressive site <br /> remediation techniques. <br /> As a result of the above considerations a meeting was held on December 17, 2004, with all concerned <br /> parties.in attendance. As a result of the"meeting it was agreed that Condor would prepare a work plan for <br /> additional groundwater investigation and feasibility evaluation of various remediation options for the site. <br /> In an email transmission on January 6, 2005; to Mr. Henderson of the SJCEHD, Condor requested an <br /> extension of the work plan submittal due date to February 4, 2005.Mr. Henderson approved the extension <br /> in a return email on January 6, 2005. <br /> LIMITATIONS AND SIGNATURE <br /> Condor has endeavored to determine as much as practical about the site within our scope of services using <br /> accepted principles and professional practice at the time the work was performed. Condor's involvement <br /> in the work performed for this report has been limited to collecting and recording system measurements. <br /> and parameters; collecting and,shipping samples; compiling field data and data provided by analytical <br /> laboratories; and interpreting field and laboratory data. Condor makes no representation as to the <br /> subsurface conditions at locations or times other than those sampled by our employees and reported in <br /> this document. Condor is not responsible for the accuracy and completeness of information collected and <br /> k developed by others. <br /> 1 <br /> OW <br /> i l� CONDOR <br />
The URL can be used to link to this page
Your browser does not support the video tag.