Laserfiche WebLink
Work.Plan-Soil and Groundwater Remediation <br /> i <br /> CSUS Multi-Campus Regional Center,Stockton,CA <br /> March 3,2003 <br /> Page S of 8 <br /> 5.0 REPORTING <br /> Following completion of the fieldwork and evaluation of the laboratory analytical data, a report will be <br /> + prepared for submittal to the SJCEHD describing the results of the investigation. At a minimum the <br /> report will include: (1) a discussion of the site history, (2) a description of the fieldwork conducted afthe <br /> { site, (3) the laboratory results, (4) a scaled site plan, (5) conclusions, and (7)recommendations. <br /> 6.0 SCHEDULE <br /> Upon approval of this work plan by the SJCEHD and appropriate permits from the SJCEHD and the City <br /> of Stockton, and notification from the CSUS Trustees to proceed, Condor can conduct the field elements <br /> described in this work plan within three months. Upon completion of the over-excavation activities, <br /> i Condor can submit a draft copy of the soil over-excavation and remediation report to the CSUS for <br /> review and comment within six weeks. The effectiveness of ozone sparging will be discussed in the final <br /> groundwater investigation report that will be produced upon completion of the current on-site <br /> groundwater monitoring investigations. If you have any questions, please call Don Kresse at (209) 234- <br /> 0518. <br /> Respectfully submitted, <br /> CONDOR EARTH TECHNOLOGIES,INC. <br /> Micheline Doyle Kipf DoF. Kresse <br /> Staff Geologist Ca ifornia Registered <br /> Geologist#6430 <br /> t <br /> t P:13024 CSUS-Multi-Campus\Work PlanlOver-Excavation Work P1an1Soil and G.W.Remediation Work Plan 3-05-03.doc <br /> E � <br /> 0 <br /> S <br /> a �1� CONDOR <br />