Laserfiche WebLink
Problem Assessment Work Plan <br /> CSUS—Multi-Campus Regional Center <br /> January 23,200 <br /> Page-lo- <br /> 9.0 PROJECT SCHEDULE <br /> Upon approval of this PAWP by CSUS, Condor can submit the PAWP to the SJCEHD and CRWQCB. <br /> Upon notification from CSUS to proceed, the direct push field portion of the investigation can be completed <br /> within approximately four to six weeks. The turn-around time for laboratory analyses is approximately two <br /> t weeks. An addendum to this PAWP with Condor's recommendations for the installation of additional <br /> monitor wells can be prepared and submitted to CSUS within two weeks of receipt of the laboratory <br /> analyses. Monitor wells can be installed within approximately two to four weeks after the number and <br /> location of new monitor wells is approved by CSUS. Development and sampling of the monitor wells can <br /> be completed within approximately one week after completion of the monitor well installation. The turn- <br /> around <br /> urnaround time for laboratory analyses is approximately two weeks. A PAR can be submitted within'three k <br /> weeks of receipt of the laboratory analyses. If you need additional information or have any questions, <br /> please callus at(209) 234-0518. <br /> Respectfully submitted, <br /> CONDOR EARTH TECHNOLOGIES E�J <br /> O s INC. F�_- GFoF. � <br /> No. 6430 <br /> Lee H, Morse Donald F. Kresse <br /> Associate Geologist California Registered <br /> Geologist#6430 of Opl`��� <br /> _r4 <br /> P-'W24 CSUS-Multi-Campus\Work Plan\Problem Assessment Work Plan\PAWP.doc <br /> �4 <br /> i 3 <br /> y A <br /> is CONDOR <br />