My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0011966
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
S
>
STANISLAUS
>
1252
>
3500 - Local Oversight Program
>
PR0545699
>
ARCHIVED REPORTS_XR0011966
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2020 10:06:25 AM
Creation date
5/28/2020 9:58:33 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0011966
RECORD_ID
PR0545699
PE
3528
FACILITY_ID
FA0010903
FACILITY_NAME
CSU STANISLAUS MULTI CAMPUS REGIONA
STREET_NUMBER
1252
Direction
N
STREET_NAME
STANISLAUS
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13921008
CURRENT_STATUS
02
SITE_LOCATION
1252 N STANISLAUS ST
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table D Itemized Cost Analysis for SVE and Groundwater Pump and Treat Alternative . <br /> ITEM Units Rate Cost <br /> Preparatory Work <br /> Work Plan preparation and approval 1 each $3,500 $3,500 <br /> Subcontract negotiations 20 hours $85 $1,700 <br /> Permit applications and fees(Well Permits,Waste Water Discharge <br /> Permit,and Air Permit) 1 site $2,000 $2,000 <br /> SUBTOTAL $7,200 <br /> SVE and Pump and Treat Well Installation <br /> Installation of SVE wells 5 each $3,000 $15,000 <br /> Installation of SVE piping 1 site $35,000 $35,000 <br />} Installation of three phase electrical 1 site $15,000 $15,000 <br /> 1 Installation of pump and treat wells with pumps 2 each $5,000 $10,000 <br /> Installation of pump and treat piping and associated equipment <br /> (Condor estimate) 1 site $20,000 $20,000 <br /> General Field Work 40 hours $75 $3,000 <br /> SUBTOTAL $98,000 <br /> SVE Equipment Rental and Operation <br /> 50 SCFNI Thermo Oxidizer(electric) 12 months $3,000 $36,000 <br /> Mobilization I each $750, $750 <br /> Demobilization I each $750 ;$750 <br /> ti Electric(Condor estimate) 12 months $1,500 $18,000 <br /> Operation and maintenance(Condor estimate) 12 months $1,200 $14,400 <br /> SUBTOTAL $69,900 <br /> �- - Pump and Treat Equipment Operation <br /> Carbon canister replacement, I per month 12 months $3,000 $36,000 <br /> Electric (Condor estimate) 12 months $300 $3,600 <br /> SUBTOTAL $39,600 <br /> y Remediation Monitoring and Reporting <br /> System monitoring and.maintenance 24 visits $300 $7,200 <br /> f <br /> Sample analysis 60 samples $250 $15,000 <br /> Monthly reporting 12 reports $600 $7,200 <br /> Verification Soil Sample Collection, analysis, and reporting 1 site $4,000 $4,000 <br /> Final reporting 1 report $3,500 $3,500 <br /> E <br /> SUBTOTAL $36,900 <br /> Contingencies(10%) $25,160 <br /> Project supervision (10%) $27,680 <br /> TOTAL $304,440 <br /> 1 <br /> 4 . <br /> PA3024 CSUS-ML11 i-Can3puslWork PlanTroblem Assessment Work PlanlTables C and D.doc <br /> } <br /> I� <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.