Laserfiche WebLink
f r r f f f r r t C r C f r f r C r <br /> CONDOR EARTH TECHNOLOGIES <br /> 1125 N. GOLDEN STATE BLVD.,TURLOCK,CA GROUNDWATER WELL DEVELOPMENT FIELD FORM <br /> 1. SITE: S t S - -- WELL ID; r^ <br /> PROJECT NO:3u�L4 CONDOR PERSONNEL: t - L �rt `✓'' �1 <br /> AMBIENT CONDITIONS Circle : Ir `adverse Idesc9be In notes section DATE: r3 cf <br /> 2. DEVELOPMENT PROCEDURE: Circle, dard Proce re I Other <br /> {Slendtrd procedure oonptts or surging the WIN vred a surge block for et suet 20 mIMMOS,followed by purpf the will of between S end t0 neing vakimn of proundwoter w0h a bilor ere pump,untR the purptd mlor becomes dcuity <br /> slew or Iad{medl. if a vtr4tllon or We procedm Is used,provide a dasar1lion In the NOR[anti n all soCtlan bddw, <br /> 3. PRE-PURGE DATA: Well Casing Depth(ft.) (detaill) Well Casing Diameter(In.y) f <br /> Initial Well Casing Depth(ft.)q 4 ILi .. (measured) <br /> Initial Depth-lo-Water(ft.)� _ Measuring Point Location WO <br /> Water Column(ft) n qPurge Vol.Calc.(for 1 casin vol.) (multipliers:2 inch=,163,4 Inch= .653,5 inch=1.02) <br /> Field Inspection Sample; Appearance: n N Odor: t � <br /> pozify[alar,oogri a or els ponce ar sheen or pre duct hiss 5 se log!,medsnle ac etron <br /> 4. PURGE DATA: Purge Device: i <br /> If pumped,specify: discharge rate(gpm) depth pump set at(ft.) <br /> Cas.Vol, <br /> Removed Time Vol,Purged Temperature pmt E.C. <br /> _ (start) tcumulstivq (circle: F ! O) <br /> 3 _ ' r <br /> Notes: <br /> 4s <br /> Notes: <br /> 5 <br /> Nates: <br /> 6 <br /> Notes: <br /> 7 <br /> Notes: <br /> 8 <br /> Notes: <br /> 9 <br /> Notes: <br /> 10 <br /> Notes: <br /> Total Vol.Purged(gals.) Final Depth-to-Water(ft.)tIL k5 Final Well Casing Depth(ft.)`l L{ 4 L- <br /> 6, ADDITIONAL FIELDNOIES: <br /> t <br /> fYormslgwdfi,wbi (8)95) <br /> r <br />