My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0011972
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
S
>
STANISLAUS
>
1252
>
3500 - Local Oversight Program
>
PR0545699
>
ARCHIVED REPORTS_XR0011972
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2020 10:03:03 AM
Creation date
5/28/2020 10:00:32 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0011972
RECORD_ID
PR0545699
PE
3528
FACILITY_ID
FA0010903
FACILITY_NAME
CSU STANISLAUS MULTI CAMPUS REGIONA
STREET_NUMBER
1252
Direction
N
STREET_NAME
STANISLAUS
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13921008
CURRENT_STATUS
02
SITE_LOCATION
1252 N STANISLAUS ST
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WORK PLAN FOR <br /> 3 <br /> SOIL AND GROUNDWATER SAMPLING <br /> BY DIRECT PUSH (GEOPROBE) <br /> California State University Stanislaus <br /> Multi-Campus Regional Center <br /> June 21, 2000 <br /> 1. INTRODUCTION <br /> This work plan was prepared by Condor Earth Technologies, Inc. (Condor) to describe soil and <br /> ,. igroundwater investigation utilizing Geoprobe direct push technology at the California State University <br /> Stanislaus (CSUS), Multi-Campus Regional.Center in Stockton, California. The site is located. at the <br /> k intersection of Aurora Street and Flora Street in the southeast portion of;the campus (Figures 1 and 2, <br /> Appendix A). The purpose of the proposed limited subsurface investigation is to evaluate the potential <br /> for petroleum hydrocarbon contamination in soil and/or groundwater related to an underground storage I <br /> , <br /> tank (UST) formerly Iocated at the site. This work plan was prepared at the request of Mr.;Mark <br /> Lemieux,Manager of Contract Services for CSUS. <br /> All work conducted by Condor will be under the supervision of a California Registered Geologist. This <br /> work plan includes project background information, a description of the field, laboratory and reporting <br /> I . <br /> ' procedures proposed to conduct the work,and a project schedule. <br /> i <br /> a iS <br /> 2. PROJECT BACKGROUND <br /> The site contained three USTs associated with past uses of the site. On July 22, 1998, Henderson <br /> r Construction of Stockton, California removed the three USTs from the site, each from a separate <br /> excavation. Tank 6 (TK6) reportedly contained fuel oil for a generator room. Tank 10 (TK10) was <br /> reportedly a 10,000-gallon capacity UST formerly containing diesel fuel. Tank 11 (TKl1) was <br /> reportedly a 1,000-gallon capacity UST formerly containing gasoline. TKIO and TKl1 were located <br /> adjacent to the north and south end, respectively, of a fuel dispenser island. TK6 was located <br /> approximately 100 feet southeast of TK10 and TKi 1. On July 23, 1998, a Condor representative was on <br /> site to collect soil samples under the direction of Ms. Letitia Briggs of the San Joaquin County Public <br /> a <br /> Health Services Environmental Health Department (PHS/EHD). The soil samples were analyzed by <br /> APCL of Chico, California. Henderson Construction prepared a brief letter report, dated August 31, <br /> I <br /> 'c <br /> t� ,F CONDOR <br /> �g <br />
The URL can be used to link to this page
Your browser does not support the video tag.