Laserfiche WebLink
Work Plan-Soil and Groundwater Investigation <br /> CSUS—Multi-Campus Regional Center <br /> June 21,2000 <br /> Page-6- <br /> t 5. PROJECT SCHEDULE <br /> i. Upon approval of this work plan by the San Joaquin County PHS/EHD and notification by CSUS to <br /> proceed, the field portion of the investigation can be completed within approximately two to four weeks. <br /> The turn-around time for laboratory analyses is approximately two weeks. A report can be submitted within <br /> two weeks of receipt of the laboratory analyses. If you need additional information or have any questions, <br /> j please call us at (209) 234-0518. <br /> { Respectfully submitted, <br /> CONDOR EARTH TECHNOLOGIES,INC. <br /> DF. <br /> GEp <br /> w <br /> F Donald F.Kresse No. Ron Skaggs <br /> California Registered N�, Division Manager. <br /> Geologist#5430 <br /> 1 <br /> r <br /> P:13024 CSUS-Multi-Carnpus\Work Plan1S&GWInvWork Plan doc <br /> } <br /> 1 <br /> • s. <br /> I <br /> L CONDOR <br /> i 3: <br />