My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0010436
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
S
>
STIMSON
>
2000
>
3500 - Local Oversight Program
>
PR0545700
>
ARCHIVED REPORTS_XR0010436
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2020 10:22:04 AM
Creation date
5/28/2020 10:18:05 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0010436
RECORD_ID
PR0545700
PE
3529
FACILITY_ID
FA0003648
FACILITY_NAME
STKN ARMY AVIATION SUPP FACILITY*
STREET_NUMBER
2000
STREET_NAME
STIMSON
STREET_TYPE
RD
City
STOCKTON
Zip
95206
APN
17726004
CURRENT_STATUS
02
SITE_LOCATION
2000 STIMSON RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ireraffianc <br /> t - dismissing field personnel from the site if their actions or negligence endangers <br /> themselves, co-workers, or the public, and reporting the same to the Project <br /> Manager and/or Health and Safety Manager within 24 , <br /> - reporting accidents or violations of the site safety plan to the Project Manager <br /> 1 and/or Health and Safety Manager within 24 hours, <br /> - knowing emergency procedures, evacuation routes, and the telephone numbers <br /> 1 of the ambulance, local hospital, poison control center, fire and police <br /> departments, <br />' - ensuring that all project-related personnel have signed the personnel agreement <br /> and acknowledgements form contained in this site safety plan, <br /> 1 - coordinating upgrading and downgrading of PPE with the Health and Safety <br /> Manager, as necessary, due to changes in exposure levels, monitoring results, <br /> weather, and other site conditions, and <br /> 1 - performing air monitoring with approved inswuments in accordance with <br /> requirements stated in this Site Safety Plan <br /> 2.4 Field Team Leader. Philip Cox <br /> iIn the event that the Project Manager and the Site Safety Officer are not on the site, <br /> the Field Team Leader will assume all responsibility for enforcing safety procedures <br /> 2.5 Field Personnel <br /> All field personnel shall be responsible for acting in compliance with all safety <br /> procedures outlined in this site safety plan Any hazardous work situations or procedures <br /> tshould be reported to the Site Safety Officer so that corrective steps can be taken The <br /> Health and Safety Manager and/or Site Safety Officer has the authority to halt any operation <br /> ithat does not follow the provisions of this Site Safety Plan <br /> . 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.