My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
S
>
STOCKTON
>
239
>
3500 - Local Oversight Program
>
PR0545701
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2020 10:26:06 AM
Creation date
5/28/2020 10:22:59 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545701
PE
3528
FACILITY_ID
FA0000720
FACILITY_NAME
MADSENS SUNRISE DAIRY
STREET_NUMBER
239
Direction
S
STREET_NAME
STOCKTON
STREET_TYPE
ST
City
RIPON
Zip
95366
APN
25927805
CURRENT_STATUS
02
SITE_LOCATION
239 S STOCKTON ST
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 of 2 <br /> Lori Duncan [EH] <br /> From: Doug Lee [dfee@grinc.com] f <br /> Sent: Friday, March 04, 2011 2:37 PM ' <br /> To: Lori Duncan [EH] <br /> Cc: James Pease <br /> Subject: City of Ripon Madsen Sunrise Dairy--Additional Sampling and Request for Exstension , <br /> Lori, <br /> Per our phone conversation yesterday, on the behalf of the City of Ripon, Gettler-Ryan (GR) is <br /> requesting an extension of the due date for the report documenting the monitoring well installation at <br /> the subject site. This request is being made to allow.for collecting a second sample from the recently <br /> installed well and the subsequent inclusion of this data in the forthcoming report.. GR has tentatively <br /> scheduled the second sampling event for Friday, March 18, 2011 and requests a report deadline <br /> extension to Friday, April 8, 2011. As discussed below, .if the results of the second sample are the <br /> same as the first, GR will recommend case closure for the subject site. From our discussion, it is my <br /> understanding that this request is acceptable to you.. Please contact me if you have any questions or <br /> comments. <br /> a <br /> Thanks, <br /> Doug <br /> Douglas J.Lee, PG <br /> Project Manager <br /> Gettler=Ryan Inc. <br /> 6747 Sierra Court, Suite J. <br /> Dublin, CA 94568 <br /> Main: (925) 551-7555 <br /> Direct: (925) 551-7444 ext. 123 <br /> Fax: (925) 551-7888 <br /> Email: dlee_@grinc.com. <br /> .From: Lori Duncan [EH] [mailto:lduncan@sjcehd.ca_m_] <br /> Sent: Tuesday, January 25, 20114:02 PM <br /> To: Doug Lee <br /> Subject: RE: Madsen Sunrise Dairy -- Analytical Results <br /> OK, thank you. <br /> From: Doug Lee [mailto:dle_e_@-gr nc.com] <br /> Sent: Tuesday, January 25, 201.13:01 PM , <br /> To: Lori Duncan[EH] <br /> Cc: James Pease <br /> Subject: RE: Madsen Sunrise Dairy --Analytical Results <br /> Hi Lori, <br /> We will be working on the report. I am currently arranging for the survey of the monitoring well. <br /> Doug Lee <br /> 3/4/2011 <br />
The URL can be used to link to this page
Your browser does not support the video tag.