Laserfiche WebLink
i <br /> E � j <br /> Geological Technics Inc. ''+✓ Page 4 <br /> Ripon Milling Inc. <br /> Monitoring Well Installation Work Plan <br /> LProject No.253.2 <br /> February 3,1995 <br /> Chain of Custody will be completed for all samples collected and tracked to ensure <br /> sample integrity. <br /> C <br /> Detection Limits: BTEX TPH=Diesel <br /> Water 41 /L) 0.3 50 <br /> Soil (µg/Kg) 3.0 5,000 <br /> Water samples will be tested for BTEX using EPA method 602 and TPH-Diesel using <br /> EPA method 3510/8015(m). The detection limits for these compounds in water are <br /> listed above in Table 1. <br /> 1.5 Groundwater Monitoring- <br /> This well will be placed on the quarterly groundwater monitoring schedule. The <br /> first monitoring event will be performed shortly after`this new well is installed. The <br /> local regulatory agency will be notified 48 hours prior.to the sampling event. <br /> i r <br /> 2.0 SCHEDULE & REPORTING <br /> Geological Technics Inc. anticipates beginning field work no later than 60 days after <br /> work plan approval and issuance of the monitoring;well permit. The information <br /> gathered during this phase of work will be presentedin a report which will include <br /> a summary of the geology and the results of sample analyses. The project will be <br /> supervised by Dr. Ray Kablanow, a registered professional geologist responsible for <br /> the work. Copies of the report will be forwarded to both the appropriate County <br /> and State regulatory agencies. <br />� - it <br />