Laserfiche WebLink
I <br /> Figure 3 Schematic of Monitoring Well Construction <br /> Ripon Milling, Inc. <br /> 320 Stockton Street <br /> Ripon, California <br /> Project No. 253.2 <br /> Ground level <br /> Watertight well box <br /> Waterproof locking cap <br /> •• • Cement grout <br /> \\ \\ Well casing, 4" schedule 40 PVC <br /> i <br /> Bentonite annular seal (2') <br /> a' 5 ft <br /> #3 sand filter pack <br /> j Ground water level (30-40') <br /> 0.020" slotted well casing, 4" <br />` schedule 40 PVC <br /> 15 ft <br /> Total depth t- <br /> p o be determined in the field <br /> j C3eo(oguaf TechttuS Inc. drawn 012695 <br />