My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
S
>
SUTTER
>
242
>
3500 - Local Oversight Program
>
PR0545704
>
FIELD DOCUMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2020 10:58:15 AM
Creation date
5/28/2020 10:49:00 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
FIELD DOCUMENTS
RECORD_ID
PR0545704
PE
3526
FACILITY_ID
FA0009999
FACILITY_NAME
AT&T California - UEX54/UE9AJ
STREET_NUMBER
242
Direction
N
STREET_NAME
SUTTER
STREET_TYPE
ST
City
Stockton
Zip
95202
CURRENT_STATUS
01
SITE_LOCATION
242 N SUTTER ST
P_DISTRICT
001
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ti. v <br /> WATER WELL TECHNOLOGY, INC. I WELENCO <br /> License No.C57-731133 <br /> 5201 Woodmere Drive Bakersfield CA,93313 <br /> Phone:(800)961-9355 Fax: Sacramento:(916)480-0839 Bakersfield(661)834-8100 <br /> Date: September 18,2014 <br /> BLASTING WORK PLAN <br /> Well: MW-1D Location:434 East Miner Ave. Plan date and time:Pending <br /> Casing 2-inch ID PVC to 144 feet <br /> Stockton CA <br /> Boosters <br /> GL Density g/cc 1.55 g/cc <br /> Detonation Velocity 24,000 ft/s 7,315 m/s <br /> Casing Diameter 2 inches <br /> 10' Detonator placed at 135 feet Charge Wt. 0.15 Kg 150 grams <br /> Detonating Cord Detonation pressure 207 k/bar <br /> Start 135 feet Total energy ea. 13,997 k/bar <br /> 20' Intervals Linear Pressure at casing 3,341.48 k/bar 50,018,545 psi <br /> End 144 feet Pressure at 10 feet 0.00 29 psi <br /> Strength 25 grain <br /> 30' Total 9 feet Explosive Cord <br /> Density g/cc 1.60 g/cc <br /> Detonation Velocity 22,000 ft/s 6,706 m/s <br /> 40' Casing Diameter 2 inches <br /> Grains 25 gr/ft 1.62 g/ft <br /> Total Explosives Detonation pressure 180 k/bar <br /> 50' .03 lbs. Total energy pef ft. 11 k/bar <br /> Pressure at casing 3.48 k/bar 52,062 psi <br /> *These are estimated pressure for a empty well <br /> 60' <br /> Site procedure <br /> 1. Check site and measure well depth <br /> 70' 2. Clear work site of all unessential personal <br /> 3. Lower charges and drop pipe if needed into the well <br /> 4. Fill well with sealing material to top of well <br /> 5. Check and clear blast area(sound blast warning) <br /> 80' 6. Arm explosives <br /> 7. Confirm area clear(final blast warning) <br /> 8. Detonate charge <br /> 9. Check hole <br /> 90' 10. Sound All Clear <br /> 100' Name of Blaster Preparing Plan: Tylor McMillan <br /> *Water Well Technology/Welenco Reserves the right to change or modify the charge <br /> in any way necessary to maintain the safety of all personnel onsite and in surrounding <br /> areas. <br /> 110' <br /> 120' <br /> 130' <br />
The URL can be used to link to this page
Your browser does not support the video tag.