Laserfiche WebLink
-The be100 off 1 1'e5 A'b MW'1 MW-2 , to 3 <br /> E C <br /> F I <br /> A. Total Depth of Boring 40 feet <br /> B. Boring Diameter 6 inches <br /> D C. Top of Metal Vault at Ground Surface <br /> A ► -- D. PVC Casing Length 40 feet <br /> E. Casing Diameter 2 inches <br /> F. Depth to Top of 0 02" Perforations 20 feet <br /> G. Perforated Length 20 feet <br /> H. Lock Cap <br /> I. Backfill Material Neat Cement <br /> G — K J. Bentonite Clay Seal 2 feet <br /> K. #3 Sand Pack 22 feet <br /> L. Clayey Soil <br /> L <br /> B <br /> MONITORING WELL CONSTRUCTION <br /> NOT TO SCALE' <br /> PLATE 4 <br /> HYDRO OEO CONSULTANTS,INC <br />