Laserfiche WebLink
a BTEX compounds were detected in well MW-1 during the January 2002 monitoring event <br /> at concentrations of 360 pg/1 benzene, 1,600 gg/l ethylbenzene and 4,700 gg/l xylenes, <br /> toluene was not detected during the January 2002 monitoring event,but was detected during <br /> the preceding September 2001 monitoring event at 160 pg/l <br /> • MTBE was detected in the monitoring well sample from well MW-2 at a maximum <br /> concentration of 9 3 gg/1 <br /> On 09 to 11 April 2003,five soil borings(CPT-1 to CPT5)were advanced on-and off-site utilizing <br /> CPT technology, at each boring location, lithologic data was collected from the initial CPT boring, <br /> an immediately adjacent twin boring was then advanced at each CPT location to collect grab ground <br /> water samples from selected depths The objective of the investigation was to model the geologic <br /> and hydrogeologic frameworks and to assess potential dissolved petroleum-migration pathways <br /> beneath the site Soil borings for sounding were as follows <br /> • CPT1 was established in the vicinity of monitoring well MW-1 and soil borings A and I to <br /> a depth of 150 feet below surface grade (bsg), <br /> • CPT2 was established in the vicinity of soil borings B and J to a depth of 160 feet bsg, <br /> • CPT-3 was established west of boring C to a depth of 160 feet bsg, <br /> • CPT-4 was established south of momtonng well MW-1 and soil borings E and G to a depth <br /> of 150 feet bsg, and <br /> • CPT5 was advanced at the northeast corner of the intersection of California Stieet and Mine <br /> . Avenue to total depths of 160 bsg <br /> Ground water and soil samples were ;ollected from CPT bonng locations at the following intervals <br /> • CPT-1 was sampicd between 96 and 100 fcet bsg,between 120 and 124 feet bsg and between <br /> 146 feet and 150 feet bsg, <br /> • CPT--2 was sampled between 93 and 97 feet bsg,between 120 and 124 feet and between 146 <br /> and 150 feet bsg and between 181 and 185 feet bsg, <br /> • CPT-3 was sampled between 56 and 60 feet bsg, between 104 and 107 feet bsg, between <br /> 120 and 124 feet bsg and between 143 and 147 feet bsg, <br /> • CPT-4 was sampled between 101 and 105 feet bsg, between 120 and 124 feet bsg and <br /> between 141 and 145 feet bsg and <br /> • CPT-5 was sampled between 56 and 60 feet bsg,between 104 and 108 feet bsg and between <br /> 146 and 150 feet bsg <br /> Soil samples were collected from boring CPT1 at 55 and 78 feet bsg <br /> The computer-generated CPT lithologic logs were integrated with previous subsurface soil <br /> descriptions to construct the subsurface geological model The site stratigraphy is composed <br /> predominantly of fine-grained soil consisting of silt, clayey silt, silty clay and clay, with the <br /> exception of five significant sand lenses or layers The sand intervals are composed of sandy silt, <br /> silty sand, sand or gravelly sand of approximately 15-foot thick or less, and are located at depths of <br /> approximately 50 feet bsg, between 60 and 75 feet bsg,between 95 and 110 feet bsg,between 120 <br /> Advanced GeoEnvironmentat <br />