Laserfiche WebLink
. 28 January 2005 <br /> AGE-NC Project No 02-0964 <br /> Page 4of7 <br /> 3.0. FIELD PROCEDURES <br /> All field procedures will be overseen by an AGE representative under the supervision of a California <br /> Registered Geologist Procedures for the well installation,well development,sampling are described <br /> below <br /> 3 1 PILOT SOIL BORING <br /> Three pilot soil borings will be advanced at the site to a maximum depth of 40 feet bsg and near 100 <br /> feet bsg,utilizing a truck-mounted hollow-stem drill ng with 8 25-inch diameter hollow-stem augers <br /> to install groundwater monitoring wells Soil samples will be collected from each soil boring at five- <br /> foot intervals Relatively undisturbed soil samples will be collected in each of the borings using a <br /> California modified split-spoon sampler fitted with 2-inch diameter,6-inch long brass sleeves Upon <br /> removal from the sampler, the sample sleeves will be separated with a knife The exposed ends of <br /> the second sleeve will be covered with Teflon sheets, capped and sealed with tape Soils sampled <br /> in the borings will be visually classified by an AGE geologist in accordance with the Unified Soil <br /> Classification System(USCS) Additionally, soil samples will be field screened for the presence of <br /> volatile organic compounds using an organic vapor meter(OVM),equipped with a photo ionization <br /> detector (PID) Soil sample descriptions and OVM readings will be recorded on a log for each <br /> boring <br /> Following sample collection,each preserved sample sleeve will be labeled with the boring location, <br /> depth,time, date and sampler's initials Appropriately sealed and labeled samples will be placed in <br /> a chilled container under ice and transported under chain-of-custody procedure to a DHS-certified <br /> laboratory <br /> 3 2 WELL COMPLETION AND WELL ELEVATION SURVEY <br /> The 8 25-inch diameter pilot borings will be single-completed as a ground water monitoring wells <br /> utilizing 2-inch diameter schedule 40 polyvinylchloride (PVC) 0 020-inch slotted well screen and <br /> blank well casing A 20-foot length of well screen is anticipated for installation of the shallow <br /> monitoring well One pilot boring is proposed to be single-completed as a deeper ground water <br /> monitoring well utilizing 2-mch diameter schedule 40 polyvinylchlonde (PVC) 0 020-inch slotted <br /> well screen and blank well casing A minimal 5-foot length of well screen is anticipated for <br /> installation of the monitoring well Typically installation of short wells screens,well below the water <br /> table,can prove difficult and may require some additional filed time and unique drilling/installation <br /> techniques,not limited to no-sample drilling and the addition of clean water to wash out the hollow <br />. stem augers of fine sediments Proposed monitoring well construction diagrams are depicted in <br /> Advanced CeoEnvirunmental,Inc <br />