Laserfiche WebLink
o i <br /> C3 FORMER EXTENT <br /> ul OF EXCAVATION <br /> m FUEL ISLAND <br /> FORMER SHOP <br /> MW-5 BUILDING <br /> d <br /> GWE-24 55' <br /> CE+6 24 <br /> MW-3 <br /> r " <br /> GWE-23 17' <br /> CE+6 23' <br /> MW-1 <br /> { NEW 9 = MONITORING WELLS <br /> FORMER BLDG CE = WELL CASING ELEVATION <br /> UNDERGROUND <br /> FUEL TANKS GWE = GROUND WATER ELEVATION <br /> AND PRODUCT 2 �- = GROUNDWATER FLOW DIRECTION <br /> LINES MW-2 <br /> CE+728 MARCH 21, 1.995 <br /> MW-4 GWE-26 06' <br /> OLD NOTE <br /> ASPHALT DRIVE BLDG <br /> ADAPTED FROM A SURVEY OF <br /> MONITORING WELLS PROVIDED BY <br /> MORTON & PITALO, INC, AND <br /> FIELD MEASUREMENTS <br /> SWIFT WAY <br /> 0 50 100 <br /> Scale in Feet <br /> SITE PLAN W KA NO 1735 02 <br /> 781 SWIFT WAY DATE 3/95 <br /> 1RAi LACE • KUFIL & ASSOCIATES, INC <br /> GEOTECHNICAL ENGINEERING Stockton, California PLATE NO 2 <br /> GEOLOGIC & ENVIRONMENTAL SERVICES <br />