Laserfiche WebLink
s 3 <br /> SAMPLE CROSS REFERENCE <br /> Page 1 <br /> Client ALISTO ENGINEERING Report Date: October 16, 1995 . <br /> Project # 0620563/10-085-09-001 ATI I.D. 510035 <br /> Project Name: BP SITE#11194/2375 TRACY BLVD TRACY CA <br /> ----------...-------------------------------------------------------------------------.. ----------- <br /> ATI # Client Description Matrix Date Collected <br /> ------------------------------------------------------------------------------------------------- <br /> 1 S-1 WATER _ 04-OCT-95 <br /> 2 S-2 WATER 04-OCT-95 <br /> 3 S-3 WATER 04-OCT-95 <br /> 4 S-4 WATER 04-OCT-95 <br /> 5 S-5 WATER . . _ 04-OCT-95 <br /> 6 S-6 WATER 04-OCT-95 <br /> 7 S-7 WATER 04-OCT-95 <br /> 8 S-8 WATER 04-OCT-95 <br /> ------------------------------------------------------------------------------------------------ <br /> ---TOTALS--- <br /> Matrix # Samples <br /> WATER 8 <br /> ATI STANDARD DISPOSAL PRACTICE <br /> The sample(s) from this project will be disposed of in twenty-one (21) days from the date of <br /> this report. If an extended storage period is required, please contact our sample control <br /> department before the scheduled disposal date. <br /> y <br /> 1 <br />