Laserfiche WebLink
,s L#ON GEoSCIENCE,INC. i <br /> Well Developnmen!and <br /> Water Sampling Field Sunray <br /> Site:, i,.Date: - <br /> Project i s0 Tretcc� <br /> Well : <br /> Sampling TO-am: <br /> Well Development Method: <br /> Sampling Method: <br /> Describe Equipment Before Sampling <br /> This Well : • <br /> 51 1 <br /> Wen oerelopsnenv wa saQMna'Dat• <br /> Water level <br /> Total Well Time: Before Pumping: . <br /> Depth! Is-aIt et <br /> Volume <br /> Water <br /> Casing Diameter �= gS <br /> - <br /> f , feet x <br /> l <br /> Depth Purging From: <br /> feet . Time purging Begins: <br /> Notes on Initial Discharge: <br /> I Hotel <br /> Time, y�i-ums �. S; t <br /> lid <br /> LEE <br /> Time Field Parameter Measurement Begins: <br /> PH - � <br /> Conductivity � --- <br /> Temperature <br /> presamP le Collection Gallons purged: • �� <br /> Time Sample Collection Begins: <br /> Time Sample Collection Ends: <br /> Total Gallons Purged: <br /> Comments! <br />