Laserfiche WebLink
f <br /> ►fir^, :� TON GEOSCIIMCE,INC. <br /> 1 Well Development end <br /> Water sampling Field Survey <br /> ProjectSite: c T 1,,/,Date: �IT.�9Z� <br /> Well : -2. sampling Team'Trucc� CA <br /> Well Development Method: <br /> Sampling Method: <br /> Describe Equipment Before Sampling This well : <br /> Well Development/Wen Sampling,0819 <br /> Total Well Water level <br /> Depth: 11--10 feet Time: {_ 1 1-o Before - Pump ing: _,._,. <br /> Volume <br /> Casing Diameter <br /> Water 2.-inch9�8ch Y91Ume E3S QL Purse <br /> �.Qlumn <br /> .q feet x 0 . 16 <br /> 6,2� F0 15•° ins: MS <br /> purging From: feet. Time Purging Beg <br /> Notes on Initial Discharge: <br /> [ty� <br /> 11.80 <br /> 1116 <br /> i 2$ <br /> 7, 5 •— Z � -S -7— <br /> L Jt-s`/— (at- <br /> Time <br /> Time Field Parameter Measurement Begins: 112 <br /> Ran 12 fi�R �— Re2 <br /> CH �.= ---- <br /> onductivity — --�— <br /> Temperature (F) � <br /> Presample Collection Gallons Purged: 'L} <br /> Time Sample Collection Begins: <br /> Time Sample Collection' Ends: <br /> Total Gallons Purged: �. <br /> Comments : <br />