Laserfiche WebLink
' CALIFORNIA REGIONALLWATERVALLQUREGIONCONTROL BOARD <br /> CENTRA3443 Routier Road <br /> Sacramento, California 95827-3098 <br /> NOTICE OF PUBLIC HEARING <br /> and <br /> Notice of Applicationtion Discharge Elimination Discharge <br /> minat on Sy tem Permit) <br /> Requirements <br /> (National Poll for <br /> MOBIL OIL CORPORATION <br /> FORMERGROUND WATER TREATMENT SYSTEM STATION <br /> DISCHARGE P4 <br /> SAN JOAQUIN COUNTY <br /> water <br /> The Mobil Oil Corporation has reqs d and treatmentt to systems to at he Cityed of 9Tracv storm <br /> from a ground water extraction <br /> drainage system. The discharge is the <br /> runder round storage esult of cleaning t anksgrou at aaformeraMobil <br /> been contaminated from the operation o 9 <br /> gasoline service station. Mobil Oil proposes to discharge 3 to 5 gallons per minute <br /> of ground water that has been treated by activated carbon. The permit sets specific <br /> limits on petroleum ofatYer quality. <br /> aThefCitycofsTracynts in the storm drainage system e. discharges <br /> its <br /> are protective of q Y <br /> to Sugar Cut, a tributary of Old River. <br /> A public meeting concerning this matter will be held: <br /> DATE: 24 January 1992 <br /> ,TIME: 9:00 a.m. <br /> PLACE: State Capitol <br /> Room 447 <br /> (lit' between L and N Streets) <br /> Persons wishing to comment or object to the proposed requirements are invited to <br /> submit same in writing to the Regional Board no later than 20 January 1992. All <br /> comments or objections received by this date will be considered in the tentative waste <br /> discharge requirements. <br /> A public hearing may be held upon the request of any interested person. After <br /> considering comments or objections, the Board may issue the waste discharge <br /> requirements. <br /> Anyone having questions on regarding this matter should contact Mr. Alexander <br /> MacDonald at (916) 361-5626. The proposed requirements and related documents may be <br /> inspected and copied at the Regional Board's office at 3443 Routier Road, Sacramento, <br /> California, weekdays between 8:00 a.m. and 5:00 p.m. <br /> J E. DEL CONTE, Supervising Engineer <br />