My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_CASE 1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
2375
>
2900 - Site Mitigation Program
>
PR0505512
>
SITE INFORMATION AND CORRESPONDENCE_CASE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2020 12:42:15 PM
Creation date
5/28/2020 12:33:11 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
CASE 1
RECORD_ID
PR0505512
PE
2950
FACILITY_ID
FA0006827
FACILITY_NAME
BP/MOBIL SERVICE STATION
STREET_NUMBER
2375
Direction
N
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
23207003
CURRENT_STATUS
02
SITE_LOCATION
2375 N TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
225
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mobil Oil Corporation A�D � � 3800 WEST AI.AMEUA AVENUE,SUITE 700 <br /> Q+ <br /> BURBANK,CALIFORNIA 91'50'5.4331 <br /> 119, <br /> October 22, 1990 S `� <br /> i <br /> Ms. Laurie Cotulla, REHS MOBIL OIL CORPORATION <br /> San Joaquin Co. Public Health FORMER SIS 10-NP4 <br /> Environmental Health Division 2375 TRACY BOULEVARD <br /> 1601 East Hazelton Avenue TRACY _CALIFORNIA <br /> Stockton, CA 95201 BP SIS 11194 <br /> F , <br /> Dear Ms. Cotulla: - - <br /> The Supplemental Site Investigation Report, dated October 1, I <br /> 199.0, was submitted directly to your office by our consultant, w <br /> Alton Geoscience. The dissolved phase benzene plume is defined <br /> by monitoring wells AMW-1, AMW-2 , MW-1, and MW-7. MW-7 is <br /> downgradient of the former Mobil and current BP site. A sheen of <br /> product was present in MW-3. <br /> Based on the results of this investigation, we feel the following <br /> is necessary: <br /> 1) Prepare a RAP for agency approval for the free-product and <br /> groundwater recovery at the site. This document will be <br /> submitted shortly under separate cover. <br /> 2) Initiate a coordinated effort with the other service station <br /> sites at this corner to concurrently monitor and sample the <br /> groundwater monitoring wells. This data will be shared to help <br /> develop a clean-up of the potentially co-mingled plumes. By copy <br /> of this letter to Chevron and Exxon, I request that you provide <br /> any comments regarding this proposed action. <br /> If"you have any questions, please" feel free to contact me at <br /> (818) 953-2519. <br /> Si c8rely, <br /> David M. Noe, P.E. <br /> Groundwater Projects Engineer <br /> DMN:st <br />
The URL can be used to link to this page
Your browser does not support the video tag.