My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012636 CASE 1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
2375
>
2900 - Site Mitigation Program
>
PR0505512
>
ARCHIVED REPORTS_XR0012636 CASE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2020 12:50:26 PM
Creation date
5/28/2020 12:37:18 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012636 CASE 1
RECORD_ID
PR0505512
PE
2950
FACILITY_ID
FA0006827
FACILITY_NAME
BP/MOBIL SERVICE STATION
STREET_NUMBER
2375
Direction
N
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
23207003
CURRENT_STATUS
02
SITE_LOCATION
2375 N TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
348
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> i . <br /> w. <br /> ALTON GEOSCIEHCB, INC' <br /> GENERAL FIELD PROCEDURES <br /> FOR <br /> SOIL BOREHOLE DRILLING AIM SA14PLING (Cont. ) <br /> If soil/and or ground water contamination is encountered <br /> g will be halted until proper <br /> during drilling, the drillin <br /> notification to responsible parties can be made. <br /> One sample from each sampling interval will be retained for <br /> s is and analyzed for the substances that have <br /> laboratory analys <br /> been historically stored in the underground tanks, as well as <br /> constituents formed by the possible degradation or <br /> transformation of the primary tank 'contents. The samples <br /> will be transported following the proper Chain of Custody <br /> procedures, presented in Appendix G. <br /> Borings that will not be converted into ground water <br /> �• monitoring wells will be sealed from the bottom of the boring <br /> to the ground surface, using neat cement. <br /> r <br />
The URL can be used to link to this page
Your browser does not support the video tag.