Laserfiche WebLink
b <br /> PR <br /> kir <br /> ALTON GEQSCIENCE.INC. <br /> Wall Development and <br /> Waler Srnpltng Fleld survey <br /> Project t - Site: �;r&A(4g-4 .Date: Il& �D _ T„ <br /> Well: i Sampling Team!TrG`cc� <br /> Well Development Method: <br /> Sampling Method: r <br /> Describe Equipment Before Sampling This Well: <br /> Well Davalopmen!/won 3wpling Dais <br /> Total K Water level <br /> Depth: feet Time: 1200 Before Pumping: ". S� <br /> - Water Casing Diameter Volume <br /> �tltunn -itch 9� h Volume F3r-tst to Urge <br /> � 9Z feet x 0.16 .65 ` d Z�C` <br /> Depth Purging From: feet. Time Purging Begins: 1x03 <br /> wmotes on Initial Discharge: <br /> _� Time Mums LSH rnnductiyity I Nntes <br /> -m iz�s 2 -7 25 <br /> rZl7 <br /> _ 7., : 61� S! 60.5 <br /> Time Field parameter Measurement Begins: iz /Y- <br /> 13 <br /> S _ <br /> R22 Rem—U He — Rep <br /> conductivity <br /> Temperature (F! <br /> Presample Collection Gallons purged: _ <br /> Time Sample Collection Begins: -- - _IZ•.. .. <br /> Time Sample Collection Ends: <br /> Total Gallons Purged: <br /> Comments: <br />