Laserfiche WebLink
Well t]evetcpment And <br /> Wlelmr sampling t'letd Survey <br /> Project Site: r�Ct Date: <br /> Wel l: M "1 Sampling Team: <br /> well Development Development Method: <br /> Sampling Method: 16c. f� <br /> Describe equipment Before Sampling This well: <br /> ,tl,SP <br /> Well Etevsloptnent/Won suppling Dela <br /> Water level <br /> Total Well Before Pumping: 5.95 <br /> Depth: 21 feet Time: 1 1 �SS <br /> Volume <br /> - Water Casing Diameter Vslume 9� LQ. Pura <br /> CDJJM 2 Bch eZ <br /> ±q.os feet x 0 1I 0. 65 2 25 <br /> J • Eeet. Time Purging Begins: <br /> Depth Purging From <br /> Notes on Initial Discharge: <br /> ~ <br /> LimKQIUM <br /> �l�Odo. <br /> q.7 o x.20 (� . � U.."�7�'6' <br /> f (•'f(���� \{ 11`. <br /> reit g�n tc�l. <br /> Time Field Parametdr Measurement Begins: g <br /> �— <br /> _ g .s �.y � <br /> H <br /> w �� rrhh <br /> woConduct ivityg— <br /> _ 'Temperature (F) <br /> Presample collection Gallons Purged: <br /> Time sample Collection Begins: r-- <br /> f2 • � g <br /> Time-Sample -C_oleclrion Ends: ------ <br /> Total Gallons Purged: �----- <br /> Comments: <br />