Laserfiche WebLink
5 <br /> ARCO / BP WELL MONITORING DATA SHEET <br /> S4' -p _ et Station# 111qq <br /> Sampler: . ��4,alt Date: -1 ZR 0-1-3Well i.D : Well Diameter. (7) 3 4 6 8 <br /> Total Well Depth. 12440 Depth to Water: 5.0o <br /> Depth to Free Product: Thickness of Free Product (feet). <br /> Referenced to arc Grade D.O. Meter (if req'd). YSt HACH <br /> Well Dimtete multlyll WO lhameces Multip ler -7,it <br /> 1„ 404 4" 065 <br /> 2" 016 6" 147 <br /> 3" 037 Other radius'•0 163 10,14 b."' <br /> Purge Method Bailer Sampling Method Basler <br /> Disposable Basler Disposable Bailer✓ <br /> Positive Air Displacement/ Extraction Port <br /> Electric Submersible Other <br /> Extraction Pump <br /> Other <br /> Top of Screen If well is listed as a no-purge, confirm that water level is below the top <br /> of screen Otherwise,the well must be purged <br /> X — 3-1� Gals <br /> 1 Case volume(Gals} Specified Volumes Calculated Volume <br /> Conductivity <br /> Time Temp (°F) pH (mS or Gals Removed Observations <br /> Did well dewater? Yes Ta Gallons actually evacuated- <br /> Sampling Time tzDo Sampling Date: -71-ZAp; <br /> Sample I D . w-6 Laboratory. Pace equo other <br /> Analyzed for 9) vs� MTBE DRO xr 12°c^ EDe 4gjOther <br /> mgI <br /> O (if req'd) Pre-purge rrSg�L Post-purge <br /> O.R P (if req'd) Pre-purge mV Post-purge mV <br /> Blaine Tech Services, Inc. 1680 Rogers Ave., San Jose, CA 95112 (408) 573-0555 <br />