My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0008048 CASE 1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
2375
>
2900 - Site Mitigation Program
>
PR0505512
>
ARCHIVED REPORTS_XR0008048 CASE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2020 2:55:07 PM
Creation date
5/28/2020 2:05:25 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0008048 CASE 1
RECORD_ID
PR0505512
PE
2950
FACILITY_ID
FA0006827
FACILITY_NAME
BP/MOBIL SERVICE STATION
STREET_NUMBER
2375
Direction
N
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
23207003
CURRENT_STATUS
02
SITE_LOCATION
2375 N TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BP GEM OIL COMPANY TYPE A BILL OF LADING <br /> SOURCE RECORD BILL OF LADING FOR NON- <br /> HAZARDOUS PURGEWATER RECOVERED FROM <br /> GROUNDWATER WELLS AT BP GEM OIL COMPANY q <br /> FACILITIES IN THE STATE OF CALIFORNIA, -THE NON- Station# <br /> HAZARDOUS PURGE- WATER WHICH ' HAS BEEN <br /> RECOVERED FROM GROUND- WATER WELLS IS Z775 F <br /> COLLECTED BY THE CONTRACTOR, MADE UP INTO Station Address <br /> LOADS OF APPROPRIATE SIZE AND HAULED BY <br /> DILLARD ENVIRONMENTAL TO THE ALTAMONT <br /> LANDFILL AND RESOURCE RECOVERY FACILITY IN Total Gallons Collected From Groundwater Monitoring Wells <br /> LIVERMORE, CALIFORNIA <br /> The contractor performing this work is BLAINE TECH <br /> SERVICES, INC (BTS), 168,0 Rogers Avenue, San Jose, CA <br /> 95112 (phone [408] 573-0555) Blaine Tech Services, Inc is added equip an other rinse watex adjustments <br /> authorized by BP GEM OIL COMPANY to recover, collect, L,l,2� Y <br /> apportion into loads the Non-Hazardous Well Purgewater that is <br /> drawn from wells at the BP GEM Oil Company facility indicated TOTAL GALS. loaded onto <br /> below and deliver that purgewater to BTS Transport routing of RECOVERED 1-10 BTS vehicle# 5 <br /> the Non-Hazardous Well Purgewater may be direct from one BP <br /> GEM facility to the designated destination point, from one BP BTS event# <br /> GEM facility to the designated destination point via another BP time date <br /> GEM facility, from a BP GEM facility to the designated <br /> destination point via the contractor's facility, or any combination <br /> thereof The Non-Hazardous Well Purgewater is and remains the <br /> 17 <br /> property of BP GEM Oil Company signature <br /> This Source Record BILL OF LADING was initiated to <br /> cover the recovery of Non-Hazardous Well Purgewater from wells <br /> at the BP GEM Oil Company facility described below RECD AT time date <br /> 3I5 5.4e- <br /> unloaded <br /> Acunloaded by <br /> signature _ <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.