Laserfiche WebLink
ARCO /BP WELL MONITORING DATA SEE El T <br /> 4R-TS #' o 3 o l -3o- 5 H- I Station.# I l I et 4 <br /> r <br /> Sampler. Scott la�K..r.o� Date: - 3o r X003 <br /> Well f D • �„� _ Well Diameter. 2O 3 4 6 8 <br /> Total Well Depth: 1 ,6. 5-3 Depth to Water: T. o ` <br /> Depth to Free Product: Thickness of Free Product (feet), <br /> Referenced to: ED X7.0 Meter (1f req'd). <br /> Y5l HACH <br /> 11[uitnlie� wCn Qtumeter �IultiakeL <br /> 004 4" 065 <br /> Tet" 0 16 0 6" i =7 <br /> 3" 037 otter radius'#0 163 <br /> Purge Method Bailer Sampling Method, Bailer <br /> ?[Disposable Bader ?CDisposable Beller <br /> Middleburg Extraction Port <br /> Electric Submersible Other <br /> Extraction Pump <br /> Other <br /> Top of Screen. If well Is listed as a no-purge, confirm that water level is below the top <br /> of screen Otherwise, the well must be purged <br /> . S X 3 — ,S Gals <br /> F—�l se Valuate(Gals,) Specified Volumes Calculated Volume <br /> Conductivity <br /> Time Temp CF) pH (mS orQ Gals Removed Observatians <br /> �« S <br /> (a6. �•9 Pla-30 3 <br /> a.P.30 a ►f.5 <br /> Did well dewateO Yes fo Gallons actually evacuated- q. s <br /> Sampling Time. I i %a Sampling Date• 1./-3,0/`4003 <br /> Sample I D : /61w - Laboratory. Pother <br /> ace equola <br /> Analyzed for TPx- ® � JTH-D Other �o <br /> m�IL Post-purge 'L <br /> D U. (if req'd). Pre-purge <br /> 1,IV Post-Pill ge MVO R P (if req'd) Pre-Pu1 ga <br /> Blaine Tech Services. Inc. 1680 Rogers Ave., San Jose, CA 95112 (408) 573-055 <br />