Laserfiche WebLink
V�rLL MONITORING DATA SHEET <br /> Project#• p pg3V-C 6 j Client <br /> Sampler C t(eSS Start Date <br /> Well I D rn t/I-- q Well Diameter 3 4 6 8 <br /> Total Well Depth I &I _ `�CJ' Depth to Water . p <br /> Before After Before After <br /> Depth to Free Product- Thickness of Free Product (feet) <br /> Referenced to V Grade PO Meter (if req'd)- YSI HACH <br /> Purge Method Samphng Method Bailer <br /> Bailer Waterra Disposable Bailer <br /> Disposable Balle Peristaltic Extraction Port <br /> Middleburg Extraction Pump Dedicated Tubing <br /> Electric Submersible Other Other <br /> Well DiameterMultiplier Well Diameter Multiplier <br /> 1. 004 4" 065 <br /> 1 (Gals)X = - Gals 2" 0 16 V 147 <br /> 1 Case Volume S ecifiVolumes Calculated Volume 3" 037 Ocher rad=Z•o 163 <br /> 01:Time Temp (°F) pH Cond Turbidity Gals Removed Observations <br /> -710c7r <br /> DTw, <br /> Did well dewater? Yes o Gallons actually evacuated <br /> Sampling Timetoot? Sampling Date: - 3d- v�r <br /> Sample I D Lj Laboratory. �a Ce <br /> Analyzed forH-G Ei7B TPH-D Other <br /> Equipment Blank I D : @ ��� Duplicate I D <br /> Analyzed for TPH-G BTEX MTBE TPH-D Other <br /> O (if req'd) Pre-purge mg�L Post-purge mg <br /> ORP (if req'd) Pre-purge mV Post-purge mV <br /> Blaine Tech Services, Inc. 1680 Rogers Ave., San Jose, CA 95112 (408) 573-0555 <br />