Laserfiche WebLink
BP WELL MONITORING DATA SHEET <br /> Project #. �2a D _ Station # /11y <br /> Sampler. v,tin 13 Date 51-30- d 2 <br /> Well ID y„1 w .'� Well Diameter 2 3 6 S <br /> Total Well Depth- ,f Depth to Water y. -70 <br /> Depth to Flee Product- Thickness of Free Product (feet)• <br /> Referenced to. vc Grade D.O. Meter (if req d) YS1 HACH <br /> Well D1EuneteT „lt, I[er Well Diameter Multiplier <br /> 1 q 004 4" 065 <br /> 2" 0 16 6" 147 <br /> 3" 037 Other md=2*0163 <br /> Purge Method Bailer Sampling Method Bailer <br /> Disposable Bailertsposa a ai e <br /> Middlebur Extraction Port <br /> ectnc ubmersible Other <br /> Extraction Punip <br /> Other <br /> gi X = a� Gals <br /> 1 Case Voluine(Gals) Specified Volumes Calculated Volume <br /> Time Temp (°F) pH Cond Gals Removed Observatons <br /> r s &27- 5 1 3 7 Z�C�a asf aa <br /> 7, y 2 <br /> 7, j Z zo 7 <br /> l <br /> Did well dewater? Yes Gallons actually evacuated 2 <br /> Sampling Time I T ?_'5 Sarnpinig Date- e-1-36 -OZ <br /> Sample I D._(_E Laboratory. Pace other <br /> Analyzed for. x-G BTEX MTB TPH-D Other <br /> Mg' <br /> D.O (if req'd). Pre-purge ,,,��� EPot-pujige <br /> O R P (if req'd). Pre-purge mV Post-pulge m <br /> Blame Tech Services, Inc. 1680 Rogers Ave., San Jose, CA 95112 (408) 573-0555 <br />