My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0008651 CASE 1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
2375
>
2900 - Site Mitigation Program
>
PR0505512
>
ARCHIVED REPORTS_XR0008651 CASE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2020 2:50:32 PM
Creation date
5/28/2020 2:35:20 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0008651 CASE 1
RECORD_ID
PR0505512
PE
2950
FACILITY_ID
FA0006827
FACILITY_NAME
BP/MOBIL SERVICE STATION
STREET_NUMBER
2375
Direction
N
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
23207003
CURRENT_STATUS
02
SITE_LOCATION
2375 N TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ALISTO ENGINEERING GROUP LOG OF BORING MW-3 Page i of 1 <br /> WALNUT CREEK, CALIFORNIA <br /> . ALISTO PROJECT NO 10-085 DATE DRILLED 12106193 <br /> CLIENT BP 011 Company <br /> SEE SITE PLAN LOCATION 2375 Tracy Boulevard, Tracy, California <br /> DRILLING METHOD Hollow-Stem Auger (10") <br /> DRILLING COMPANY Soils Exploration ServicesCASING ELEVATION 2521 <br /> LOGGED BY Ted Moise APPROVED BY Al Sevilla <br /> � � J <br /> WELL DIAGRAM �� � � GEOLOGIC DESCRIPTION <br /> O y O <br /> i <br /> �7 <br /> 0 <br /> The original Groundwater Monitoring well, MW-3, was <br /> destroyed and replaced In the same location with <br /> 4-inch-diameter Recovery well, MW-3, see well construction <br /> diagram <br /> o See attached boring log by Kaprellan Engineering, Inc for <br /> _ <br /> LCU sail classification and discrlptions <br /> _ The well was initially overdrilled with 8-inch-diameter <br /> hollow-stem augers to remove the sanitary seal materials and <br /> m provide access to the well casings The well casings were <br /> then removed, and the hollow-stern augers were advanced to <br /> the total depth of the original boring After drilling, the well <br /> c _ 1a was constructed as shown <br /> b — � <br /> � = c <br /> _ 4 <br /> 4 U <br /> N <br /> Q 15 <br /> 20- <br /> 25- <br /> 30— <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.