Laserfiche WebLink
ALISTO ENGINEERING GROUP <br /> Groundwater Development and Sampling Form <br /> Client: 6f Date•. 101 Xa09 3 <br /> AlistoProject No- D _ ��S Field Personnel. L � <br /> Service Station No: Address: <br /> �/ Trgc <br /> Well ID �'Iw" 1eld Actives• Well Development /� Well Sampling _,_,_Product Bailing <br /> Casing Diameter Purge Method Well Data: <br /> _._2 Inch (0 16 Gal/foot) -X-Pump (dlspos Poly Tubing) Depth to Product <br /> 3 Inch (0 37 Gal/foot) _ P <br /> Dis osable Bailers4Product Thickness <br /> 4 Inch (0 65 Gal/Foot) _Other S 'U-Depth to Water <br /> ^4 5 Inch (0 83 Gal/foot) —166 PVC Standard Bailer <br /> ^6 Inch (147 Gal/foot) �3 50 PVC Standard Bailer <br /> Sampling Method Decontamination Method <br /> Disposable Bailer X Tnple Rinse (Liquinox) <br /> Pump Steam Cleaned <br /> Calculated Purge Volume <br /> O�FftX5 °13 GalX � - 17 <br /> �r� <br /> Total Depth Depth to Water Conversion Casing Vol Vols to Total <br /> of Well Water Column Factor Purge Volume <br /> Well Development/Sampling Parameters <br /> Time Temp pH Cond Purge Comments/ Analysis Container Presery <br /> OF (un-hos/ Vol Turbidity Required 'Type <br /> �))(1 c C C (Gal) <br /> VOA HCL <br /> G/B <br /> L �n G/BTEX <br /> b 1 `—] TPH- Amber Solvent <br /> T ( DieselLiter Rinsed <br /> 1137 -79S F Zn L,1 I )Q EPA 601 VOA <br /> } f TOG Amber H2SO4 <br /> 79 V C) 1 55ZOBF Later <br />• FORM F531121592 <br />