Laserfiche WebLink
ALISTO ENGINEERING GROUP <br /> Groudwater Development and Sampling Form <br /> Client 9P Date (ph(o <br /> Ahsto Project No J D'8 Field Personn I. L -^ <br /> Service Station No J 1`�� _. Address: CIO IV, <br /> Well ID-&NTField Activity Well Development Weil Sampling _Product Bailing <br /> Casing Diameter Puree Method Well Data. <br /> 2 Inch (0 16 Gal/foot) Pump (dispos Poly Tubing) Depth to Product <br /> S Inti (0 37 Gal/foot) _thsposable Balers Product Thickness <br /> 4 Inch (0.65 Gal/Foot) _Other 3� Depth to Water <br /> _4 5 Inch (0 83 Gal/foot) _1 66 PVC Standard Bailer <br /> �6 Inch (1 47 Gal/foot) �3 50 PVC Standard Bader <br /> Samplsnz Method- Decontamination Method <br /> JDisposable Bailer Triple Rinse (Liquinox) <br /> Pump Steam Cleaned <br /> Calculated Pure Volume �- <br /> . - lq _A . 3 -7 Lie -- =1] 1�ft x Sca t - Z cel x 3 �- <br /> Total Depth Depth to Water Conversion Casing Vol Vols to Total <br /> of Well Water Column Factor Purge Volume <br /> Well Develoloment/Samplin&Parameters <br /> Time Temp pH Cond Purge Comments/ Analysis Container Presery <br /> OF (umhos/ Vol Turbidity Required Type <br /> cm) (Gal) <br /> I r 100 '7PH- VOA HCL <br /> 3 37J 73 TPH- Amber Solvent <br /> ^� F I s aesel Liter Rinsed <br /> 33 17 O -3 I -al OD EPA 601 VOA <br /> 33�17G a� 1 1 ��p-SO TOC Amber <br /> 5320BF <br /> Liter <br /> 330 S 13 a <br /> • FgFM.FSM21592 <br />