Laserfiche WebLink
ALISTO ENGINEERING GROUP <br /> Groundwater Development and Sampling Form <br /> Client: p Date: 3 I °y 3 <br /> A1Lsta Project Na 107015 meld Personnel. <br /> Service Station No: Addxess: R c <br /> Well ID• ±yu-�FLeld Activl • __Well Development Lwell Sampling ,._Product Bai1Lng <br /> Casing-Diameter Purge Method Well.l.Dat r <br /> 2. Inch (0 16 Cal/foot) Pump (dispos Poly Tubing) Depth to Product <br /> 3 Inch (0 37 Cal/foot) _Disposable Bailers Product Thickness <br /> �4 Inch (0 65 Cal/Foot) Other 4. Depth to Water <br /> �4 5 Inch (0 83 Cal/foot) _1.66 PVC Standard Bailer <br /> �6 Inch (1 47 Cal/foot) 3 50 PVC Standard Bailer <br /> Sampling Method• Decontamination Method <br /> 4Disposable Bailer Triple Rinse (Laqulnox) <br /> pip Steam Cleaned <br /> Calculated PLLr> Volume _ LLLft X Gal Ft = ---lO 3—Gal X 3 = E 41 <br /> . Total Depth Depth to Water Conversion Casxns Vol i urged Total <br /> V of uine <br /> of Well Water Column Factor <br /> Well Develol2ment/Sami?ltng Parameters <br /> e Comments/ At►alysLi Contal 1'r� ry <br /> Tune Temp pl-1 Coad Purge <br /> uF (umlios Vol Turbidity Xuqum d TYPE' <br /> /cm) (Gal? <br /> TPH- VOA 11CL <br /> c/aTEx <br /> -7 '] TPH- Ainikr SulVLnt <br /> 3 I f b o1 �j Diwol Later I:uis�d <br /> 33•� b 9 ! g g 3 EPA 601 VOA <br /> TOG Aml4r <br /> �33g q I 0 <br /> ) . 97 <br /> ) • fJ 7 5520BF Ltt�r <br /> f339 &9 0 7l�� + `SSI S s <br /> 3 13 3 °1 1343 <br /> ,010d I S3=192 <br />