Laserfiche WebLink
ALISTO ENGINEERING GROUP <br /> Groundwater Development and Sampling Form <br /> L Date: -3 0 3 <br /> Chem _o$Sf-� Field Person el <br /> Ahsto Project No: Address•_�'�- <br /> Service Station No. <br /> Well ID Mw-' Field Active • Well Development Well Sampling _Product Bailing <br /> Casing Diameter, <br /> Purge Method Well Data- <br /> 2 Y inos Poly Tub ) Depth to Product <br /> 2 Inch (0 16 Gal/foot} Pump ( p � <br /> Product Thickness <br /> �3 Inch (0 37 Gal/foot) _Disposable Bailers Depth to Water <br /> ,2�_4 Inch (0 65 Cal/Foot) _ Other <br /> 4.5 Inch (0 83 Gal/foot) _,,,_I 66 PVC Standard Bailer <br /> �6 Inch (147 Gal/foot) 3 50 PVC Standard Bailer <br /> 51m lin Method• Decontamination Method <br /> Disposable Bailer Y Triple Rinse (Ligtunox) <br /> imp Steam Cleaned <br /> Calculated Pure Volume _7 �ft X ��GaI1Ft = s' 0 Gal X . — 1�3 <br /> -- I -- s 4 <br /> Total Depth Depth to Water Conversion Casing Vol i urged VolumC <br /> of Well Water Column Factor <br /> Well Develo ment/Saui lin Parameters <br /> Analyse Cuntat 1'r�x.ry <br /> Tun, Temp PHCond Purge Coming na/ R&XJu�rLd i„r <br /> "F (umhos Vol Turbidity rype <br /> /cin) (Cal) <br /> �o R ooD I TPH- X VOA IICL <br /> 7o rAintxx Sulvutt <br /> q� q Ti'H- <br /> o I 71 I p 1 l Dw-'d LitLr l:utiZ�Ld <br /> JJ 0 El'A 601 VOA <br /> ,SOr� lO TOG Amb.r 1150. <br /> X03 $,`1 707 ` U f d;is- 5520OF LLL"7o 3 b 1Ss <br /> 14s� � <br /> F01tt.1 Fs3/1Z1592 <br />