Laserfiche WebLink
ALISTO ENGINEERING GROUP <br /> Groundwater Development and Sampling Form <br /> Client: 9 f Date: <br /> Alisto Project No• Field Perso el. <br /> Service Station No Q Address. � <br /> Well ID:�J'? Feld Acttyf : __Well Development Lwell Sampling _.__11'roduct 13alhng <br /> Casine Diameter Purge Method Well Data- <br /> L2 Inch (0.16 Gal/foot) X Pump (dispos. Poly Tubing) Prodtuct Th>`Product <br /> ckness <br /> ___.3 Inch (0.37 Gal/foot) _Disposable Bailers Depth to Water <br /> 4 inch (0 65 Cal/Foot) .Other <br /> _4 5 Inch (0.83 Gal/foot) _I 66 PVC Standard Bailer <br /> 6 Inch (1 47 Gal/foot) _3 50 PVC Standard Bailer <br /> Sampling Method: Decontamination Method <br /> x Disposable Bader � Triple Rinse (Llquinox) <br /> pump Steam Cleaned <br /> Calculated Pur volume = „ _ = '�8 Gal X — 4- ++ <br /> Lasft I f GaUFt <br /> Depth to Water Conversion Casing Vol vols to To <br /> Total DepthVolume <br /> of Well Water Column Factor be <br /> Well DeveloRment/Sampling Parameters <br /> Cotn <br /> Cond Purge mp ppnaly,i, Contac I'r4xry <br /> Tune TelPurgeu►et►ts� Rtr�d nix <br /> �F Winhos .xlu <br /> Vol Turbidity nix <br /> //C111) (Gal) Type <br /> x lgfloD l TPH- VOA I LCL <br /> -7 <br /> 1 � U 1 I CIBTFX <br /> TPH- Amr SUMAlt <br /> �Sa9 -7''�O h !1 q� "� ptla�l Lltlr liul�d <br /> .530 ! D b 7.1(a f I 0 -� 75"- FPA 601 VOA <br /> TOC Amb--r Ii;SQ� <br /> 552013F Litt-r <br /> 4 S7 <br /> S3 � <br /> We <br /> FoHh1 ks7..n592 <br />