Laserfiche WebLink
• s • <br /> TABLE 1-SUMMARY OF RESULTS OF GROUNDWATER SAMPLING <br /> BP OIL COMPANY SERVICE STATION NO 11194 <br /> 2375 TRACY BOULEVARD,TRACY,CALIFORNIA <br /> ALISTO PROJECT NO 10-085 <br /> WELL DATE OF CASING DEPTH TO PRODUCT GROUNDWATER TPH-G B T E X MTBE DO LAB <br /> ID SAMPLING/ ELEVATION (a) WATER THICKNESS ELEVATION (b) (ug/A) (ugA) (ugA) (ugA) (110 (ugA) (ppm) <br /> MONITORING (Feet) (Feet) (Feet) (Feet) <br /> OC-2 (i} 12/08/92 — - — -- ND<50 ND<0 5 ND<O 5 ND<0 5 ND<O 5 --- — ANA <br /> QG2 (i) 03/10/93 — - — ND<50 ND<0 5 ND<0 5 ND<0 5 ND<O 5 --- — PACE <br /> (C-2 {i) 06/16/93 — — — -- ND<50 ND<0 5 ND<0 5 ND<O 5 ND<O 5 -- — PACE <br /> OC-2 (i) 10/22/93 — --- — -- ND<50 ND<O 5 ND<0 5 ND<O 5 ND<O 5 — — PACE <br /> QC-2 (i) 01/24/94 -- — -- ND<50 ND<0 5 ND<0 5 ND<0 5 ND<0 5 --- --- PACE <br /> QC-2 007/94 --- — - --- ND<50 ND<O 5 ND<O 5 ND<O 5 N0<0 5 — --- PACE <br /> QG-2 09/13/94 — --- — -- ND<50 ND<O 5 ND<0 5 ND<O 5 ND<0 5 — --- PACE <br /> OC-2 {i) 01110/95 --- — -- — ND<50 ND<O 5 ND<0 5 ND<0 5 ND<1 — -- ATE <br /> QC-2 ('1 03/2MS -- — — -- ND<50 ND<O 50 ND<0 50 ND<0 50 ND<10 -- — ATI <br /> QC-2 10/04/95 — --- — --- ND<50 ND<0 50 ND<O 50 ND<0 50 ND<10 ND<50 --- All <br /> QC-2 {i) 01/74/96 - — --- ND<50 ND<0 50 ND<0 50 ND<O 50 ND<10 ND<5 0 — ATI <br /> QC-2 (i) 03/29/96 -- — — -- ND<50 ND<0 5 ND<i ND<1 ND<1 ND<10 — SPL <br /> QC-2 (i) 07/01/96 --- — -- -- ND<50 ND<O 5 ND<i ND<i ND<1 ND<10 -- SPL <br /> 17 Apr-98 Page 15 <br />