Laserfiche WebLink
TABLE 1-SUMMARY OF RESULTS OF GROUNDWATER SAMPLING <br /> BP OIL COMPANY SERVICE STATION NO 11194 <br /> 2375 TRACY BOULEVARD,TRACY,CALIFORNIA <br /> ALISTO PROJECT NO 10-085 <br /> WELL DATE OF CASING DEPTH TO PRODUCT GROUNDWATER TPH-G B T E X MTBE DO LAB <br /> ID SAMPLING/ ELEVATION (a) WATER THICKNESS ELEVATION (b) (ug/11) (ug/I) (UgA) {Ugll) (ug/I) (W) (ppm) <br /> MONITORING (Feet) (Feet) (Feet) (Feet) <br /> MW-2 11120/87 - ND<50 ND<0 5 ND<O 5 ND<0 5 SUP <br /> — <br /> MW-2 03/13/88 2633 667 --- 2066 <br /> — '- _ <br /> MW-2 03/23/88 2633 563 — 2070 ND<50 ND<O 5 ND<0 5 ND<0 5 — SUP <br /> MW-2 06/07/88 2633 570 — 2063 <br /> MW-2 1011 a/88 2633 570 — 2063 ND<50 ND<0 5 ND<0 5 ND<0 5 ND<O 5 — SUP <br /> MW 2 02215/90 2633 535 — 2098 50 43 08 07 1 6SUP <br /> MW-2 04/26/90 2633 550 — 2083 --- -- -- <br /> MW 2 07/12/90 2633 548 — 2085 80 04 13 05 15SUP <br /> MW-2 08/27/90 2633 560 --- 2053 -- — — <br /> MW-2 11/02190 2633 585 — 2048 <br /> MW-2 11/05!90 2633 587 — 2046 ND<50 ND<O3 ND<O 3 ND<03 ND<O 3 SUP <br /> MW-2 02/25/91 2633 534 — 2099 ND<50 ND<O 3 ND<0 3 ND<0 3 ND<O 3 — — SUP <br /> MW-2 06/27/91 2633 607 - 2026 ND<50 ND<0 5 ND<0 5 ND<0 5 ND<0 5 — — CHR <br /> MW 2 09/25/91 2633 636 1997 NDA 30 ND<O 30 ND<0 30 ND<0 30 ND<O 30 — SEQ <br /> MW-2 12/10/91 2633 566 -- 2047 ND<O 30 ND<0 30 ND<0 30 ND<0 30 ND<O 30SEQ <br /> MW 2 03/25/92 2633 542 --- 2091 240 42 18 080 38 --- — SEQ <br /> MW-2 06/25/92 2633 733 — 1900 NN30 ND<0 30 ND<0 30 ND<O 30 ND<O 30 — SEQ <br /> MW-2 12/08/92 2633 591 — 2042 61 ND<O 5 ND<O 5 ND<O 5 ND<0 5 — ANA <br /> MW 2 03/10/93 2633 569 --- 2064 220 35 06 57 92 — — PACE <br /> MW-2 06116+93 2633 353 - 2280 ND<50 ND<O 5 ND<0 5 ND<0 5 ND<O 5 — — PACE <br /> MW 2 10/22/93 2633 606 2027 460 10 06 1 4 0 8 1570 (c) PACE <br /> QC-1 (d) 10/12/93 — 460 09 07 14 08 1700 (c) — PACE <br /> MW-2 01/24/94 2633 563 — 2070 ND<50 ND<0 5 ND<0 5 ND<0 5 06 -- PACE <br /> MW-2 06/07/94 2633 608 -- 2025 ND<50 ND<O 5 ND<O 5 ND<O 5 ND<O 5 -- 28 PACE <br /> MW-2 09/13/94 2633 636 --- 1997 ND<50 ND<O 5 ND<O 5 ND<O 5 ND<O 5 81 PACE <br /> MW 2 01/10/95 2633 554 — 2079 100 6 2 ND<O 5 12 -- 52 ATI <br /> MW-2 03/23/95 2633 563 2070 ND<50 053 ND<O 50 051 19 — 89 ATI <br /> MW 2 10/04/95 2633 637 — 1996 210 ND<10 ND<10 ND<10 ND<2 0 840 71 ATI <br /> MW-2 01/04/96 2633 590 2043 3900 ND<25 ND<25 ND<25 ND<50 12000 30 ATI <br /> MW-2 03029/96 2633 659 — 19 74 9200 34 9 3 4 12000 36 SPL <br /> QC-1 (d) 03029/96 -- 11000 37 9 4 5 13000 — SPL <br /> MW-2 07/01/96 2633 716 1917 5200 58 33 ND<i ND<1 10000 31 SPL <br /> MW-2 10/15/96 2633 734 — 1899 ND<250 ND<2 5 ND<50 ND<50 ND<5 0 14000 40 SPL <br /> MW-2 04/16/97 2633 598 — 2035 180 ND<0 5 ND<10 ND<i 0 ND<10 57 42 SPL <br /> MW 2 10/15/97 2633 608 - 2025 ND<50 ND<0 5 ND<10 ND<10 ND<10 120 54 SPL <br /> QG1 (d) 10/15/97 — --- ND<50 ND<0 5 N0<10 ND<10 ND<10 120 -- SPL <br /> MW-2 03/17/98 2633 5 57 --- 2076 170 ND<0 5 ND<10 ND<1 0 ND<10 i 180 61 SPL <br /> 17-Apr-98 Page 2 <br />