Laserfiche WebLink
' 12/05/2005 17:14 FAX 209 9480 <br /> RLEINFELDER <br /> ATTACI ENT C <br /> COST ESTIMATE <br /> The estimated cost for completing the described scope of work is outlined below. The estimated <br /> costs are based on Klein;elder's 2001 Stockton Fee Schedule. A detailed project estimate is as <br /> follows: <br /> Task Permitting and Pre-ReldAetivlties <br /> Permitting* S 380. <br /> Professional Services $—M La- <br /> Subtotal Task 1 S 1,230. <br /> this fee is for one Sap Joaquin County Environmcataf Health Department(WERD) 9oriny/Wcll Permit Application anti <br /> pertmt Ml . Additional fees imposed by SCDBR arc not included in this cost est mm <br /> Task 2 Field Activities <br /> Professional Services S 1,500. <br /> Equipment and Materials $ 400. <br /> Push Probc/CPT Contractor&Crew <br /> (Including materials) S 2206. <br /> Subtotal S 4,700, <br /> Laboratory Analysis(Standard TA.7): <br /> Twelve(12)soil samples for: <br /> • (Volatile Organics by EPA 8260 w/ <br /> 5 Oxygenates Q S175Jeach) $ 2,100. <br /> • (Total Lead Q$20./escb) $ 340. <br /> Four(4)water samples for: <br /> .(Volatile Organics by EPA 8260 w/ <br /> 5 Oxygenates®$175./each) $ 700. <br /> • (Total Lead L S20./each) $ g0. <br /> Subtotal S 3,120. <br /> Subtatal Task 2 $7,820. <br /> Task Reporting <br /> Professional Services 1 <br /> Subtotal Task 3 GHQ` <br /> Estimated Total(Task 1 through 3) $10,550, <br /> 02001 PROP.ENVIST03P443 December 5,2003 <br /> C 2003 iflemielder,Inc. <br /> ...Yi�$1nlMfdn�i�:AvS41.._ .. ....r .� ............� ' <br /> y+L!"xZh' �54 <br />