Laserfiche WebLink
Three B's Truck Plaza - 6 - June 2012 <br /> Claim No. 12992 <br /> Monitoring Well Information <br /> Well Designation Date Installed Screen Interval Depth to Water <br /> (feet bgs) (feet bgs) <br /> Jul 2011 <br /> MW-1 Mar 99 5-25 13.27 <br /> MW-2 Mar 99 5-25 13.35 <br /> MW-3 Mar 99 5-25 11.01 <br /> MW-4 Mar 99 5-25 11.60 <br /> MW-5 Mar 99 5-25 12.82 <br /> MW-6 Mar 99 5-25 10.32 <br /> MW-7a Jan 03 40-45 13.04 <br /> MW-7b Jan 03 70-75 13.14 <br /> MW-7c Jan 03 95-100 11.10 <br /> MW-7d Jan 03 120-125 11.07 <br /> MW-7e Jan 03 145-150 11.51 <br /> MW-8a Jan 03 15-25 12.30 <br /> MW-8b Jan 03 40-45 12.80 <br /> MW-8c Jan 03 70-75 10.83 <br /> MW-8d Jan 03 95-100 10.83 <br /> MW-8e Jan 03 120-125 10.95 <br /> MW-8f Jan 03 145-150 11.26 <br /> MW-9a Jan 03 40-45 11.30 <br /> MW-9b Jan 03 70-75 10.20 <br /> MW-9c Jan 03 95-100 8.63 <br /> MW-9d Jan 03 120-125 8.75 <br /> MW-9e Jan 03 145-150 9.14 <br /> MW-10a Jan 03 15-25 12.04 <br /> MW-10b Jan 03 40-45 12.07 <br /> MW-10c Jan 03 70-75 10.29 <br /> MW-10d Jan 03 95-100 10.23 <br /> MW-10e Jan 03 120-125 10.32 <br /> MW-10f Jan 03 145-150 10.50 <br /> MW-11a Jan 03 15-25 13.17 <br /> MW-11b Jan 03 4045 13.20 <br /> MW-11c Jan 03 70-75 10.80 <br /> MW-11d Jan 03 95-100 10.83 <br /> MW-11e Jan 03 120-125 10.83 <br /> MW-11f Jan 03 145-150 11.31 <br /> MW-12a Jan 03 15-25 12.71 <br /> MW-12b Jan 03 40-45 12.71 <br /> MW-12c Jan 03 70-75 10.61 <br /> MW-12d Jan 03 95-100 12.64 <br /> MW-12e Jan 03 120-125 10.58 <br /> MW-12f Jan 03 145-150 11.10 <br /> MW-13a Jul 05 14-24 12.40 <br /> MW-13b Jul 05 39-44 12.41 <br /> MW-13c Jul 05 69-74 10.71 <br /> MW-13d Jul 05 94-99 10.74 <br />