My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE HISTORY
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
U
>
UNION
>
425
>
3500 - Local Oversight Program
>
PR0545776
>
SITE HISTORY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2020 4:45:30 PM
Creation date
5/28/2020 4:35:40 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE HISTORY
RECORD_ID
PR0545776
PE
3528
FACILITY_ID
FA0002231
FACILITY_NAME
JACK FROST ICE SERVICE
STREET_NUMBER
425
Direction
N
STREET_NAME
UNION
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
15112003
CURRENT_STATUS
02
SITE_LOCATION
425 N UNION ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
137
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
November 3, 1999 <br /> Page 2 <br /> Item 3.3 The baring by permit from San Joaquin County <br /> Environmental Health will be with a hollow stem <br /> flight auger. 3 1/4" I .D.-8 7/8" O.D. to a depth <br /> of 20 ' , with samples taken at 10 '-15 ' -20' . <br /> , Item 3.4 The well is to be sealed with bentonite. <br /> Item 4.0 The proposal re-excavation is plus 10 ' on all sides <br /> of the current excavation to a depth of 20' . <br /> Item 4 . 1 The surface location is found on site map and is <br /> 94 28'L x 22' wide with the excavation extending B' <br /> from face of curb into Union St. <br /> Item 4.2 All concrete and asphalt will be saw cut to be <br /> removed. All removed areas will be replaced to <br /> City of Stockton standards. <br /> Item 4.3 All encroachment permits will be obtained from the <br /> City of Stockton Public Works. <br /> Item 4.4 Approximately 450 cubic yards will be removed . <br /> Item 5.0 A total of eight (8) samples will be taken by <br /> California Water Laboratory. One ( 1 ) sample taken <br /> in each face and four (4) taken from the floor , at <br /> ^� a depth of 20 ' . en�, . q�'� A'bat'�. 5 Q, 170A0- 50-w <br /> �l <br /> Item 5. 1 Samples will be taken using steam�cleaned brass <br /> cylinders, held under a chain of custody and <br /> analyzed for TEPH-oil by EPA methods 3550 or 3540. 0`Ld <br /> BTX and E were non detected during previous /, � <br /> sampling . `-�JQ's4z- <br /> &),Y? <br /> _ <br /> &)l Item 6.0 1 After lab analysis has certified the excavation is a�Q --t' <br /> below the levels of contamination, it will be • <br /> backfilled and compacted to the City of Stockton <br /> standards. <br /> 51ott �4 Item 7.0 he removed soil will be stored upon the property <br /> �6f Union Ice in the packing area to the north of <br /> v the existing facility. <br /> Item 7. 1 A bio remediation plan will be filed with San <br /> Joaquin Environmental Health, for soil treatment. <br />
The URL can be used to link to this page
Your browser does not support the video tag.