My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
U
>
UNION
>
425
>
3500 - Local Oversight Program
>
PR0545776
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2020 4:45:09 PM
Creation date
5/28/2020 4:38:04 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545776
PE
3528
FACILITY_ID
FA0002231
FACILITY_NAME
JACK FROST ICE SERVICE
STREET_NUMBER
425
Direction
N
STREET_NAME
UNION
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
15112003
CURRENT_STATUS
02
SITE_LOCATION
425 N UNION ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
216
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 1 <br /> - r <br /> INTRODUCTION <br /> } <br /> This task specific Site Safety and Health Plan (SSHP) was prepared by ICF';Kaiser (ICF) for � <br /> work to be conducted at 425 North Union Street and 1320 West Weber Street in Stockton, <br /> California. This SSHP was prepared in accordance with guidelines set forth in Title 29 of <br /> the Code of Federal Regulations, Part 1910.120 (29 CFR`�'1910.120) and Title 8 of the Code <br /> of California Regulations, Section 5192 (8 CCR 5192). The provisions of this SSHP apply <br /> only to ICF personnel field activities associated with the Site Assessment Oversight activities. <br /> The health and safety guidelines and requirements presented herein are based on a review of <br /> available information and an evaluation of potential hazards. This plan describes the health <br /> and safety procedures and equipment required for activities at this site to minimize the <br /> potential for exposures to field personnel. Should circumstances during th6i course of field <br /> work be extraordinarily different than anticipated, field work shall be temporarily stopped, so <br /> that potential hazards can be evaluated and appropriate health and safety precautions <br /> implemented. <br /> The provisions of this SSHP will be implemented by ICF .personnel. All subcontractors are <br /> responsible for their own health and safety program, however, subcontractors will also <br /> comply with the requirements of this SSHP. <br /> k <br /> 1. <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.