My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
U
>
UNION
>
425
>
3500 - Local Oversight Program
>
PR0545776
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2020 4:45:09 PM
Creation date
5/28/2020 4:38:04 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545776
PE
3528
FACILITY_ID
FA0002231
FACILITY_NAME
JACK FROST ICE SERVICE
STREET_NUMBER
425
Direction
N
STREET_NAME
UNION
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
15112003
CURRENT_STATUS
02
SITE_LOCATION
425 N UNION ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
216
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ICF KAIS ' ' '. <br /> 1 <br /> .March 9, 1994 <br /> WORK PLAN FOR <br /> VERIFICATION SAMPLING FOR SITE CLOSURE <br /> AT THE FORMER UNION ICE COMPANY FACILITY <br /> 425.NORTH UNION STREET, STOCKTON, CALIFORNIA <br /> 1.0 INTRODUCTION <br /> At°the request of the Union Ice Company, ICF Kaiser has prepared this work plan to conduct an <br /> environmental site investigation, including verification soil and groundwater sampling, and the <br /> preparation of a findings report for the former Union Ice facility at 425 North Union Street, <br /> Stockton, California. <br /> The activities described in this work plan are designed to meet the site closure requirements of <br /> the San Joaquin County Environmental Health Division per our meeting of February 10, 1994. <br /> 2.0 PROPOSED SCOPE OF WORK <br /> The proposed work will include the following specific tasks: <br /> Task 1: Work Plan Preparation <br /> Task 2: Site Safety and Health Plan Preparation <br /> Task 3: Permitting and Utility Clearance " <br /> Task 4: Subsurface Soil Sampling <br /> Task 5: Groundwater-Sampling of Existing Monitoring Wells <br /> Task 6: Laboratory Sample Analyses <br /> Task 7: Data-Evaluation and Report Preparation <br /> Task 8: Project Management . <br /> These .tasks are described in detail below. <br /> Task 1: Work Plan Preparation <br /> Based on the results of previous investigations, .this work plan has been prepared by ICF Kaiser to <br /> meet regulatory requirements and-attempt to collect.all necessary data to support site closure <br /> proceedings. The-work plan will be delivered to the San Joaquin County Environmental Health <br /> Division. <br /> i€ r jmf unionicedaw n.pro 1 <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.