Laserfiche WebLink
SAN .700_-_JUIN LaCAL H Ar.Tu DZS'�i�t2C.T <br /> SAMPLING PROTOCAL FOtt ROUTINE TANK REMOVALS <br /> The following re resents minimum sampling criterion required for closure compliance. Soil <br /> samples collected shall. be representative of native so is beneath the tank's <br /> isvert documentednk sduringmcl osurecoaneUUnauthorizednReleasexnotdificationemust berfilledsouttand <br /> submitted to SJLHD withln 5 bays. Section 2652, CCR. <br /> WA—AfM MO'P PRESENT IN THE TANK PIT <br /> r_FZjh.an <br /> K SIu MINIMUM NUMEW OF LOCATION OF SOIL SAMPLES <br /> _ SOIL SAMPLES <br /> 000 gallons ONE per tank Pill or pump end of tank <br /> 00 gallons TWO pet tank One at each end of tank <br /> ons arae.'. up THREE OR MORE, Ends and Middle or <br /> Per tankheeienq�hso ct�laeatank ONE ELFIItY 20 Z,INEAL FSI' <br /> WATER IS PRSENT IN'TANK PIT <br /> TANK SIZE MINIKJM NO. OF LOCATION OF SOIL MINIA" NUMBER <br /> SOIL SAMPLES SAMPLES OF WATER SAMPLES <br /> O� �SGALL S From wall next to <br /> (Single Tank) TWO gtank kends a). soil/ ONEinterf-ace <br /> 1GREATER <br /> E0 0 N From wail next to O <br /> ��S cttsank ends.a_t soil/ <br /> TANK CLUSTER FOUR intik face <br /> �T� SPEC=A'C, CQL`IDIT=C]I`YS <br /> SLAB PRESENT IN TANK FIT <br /> Soil samples shall be obtained beneath the slab within native soils. Penetration through <br /> the obstruction will be required in order to collect the samples. (Physical removal of the <br /> obstruction will then allow sampling according to the above conditions.] <br /> TANK SIZE MINIMUM NL+mM OF LOG,4TION OF SOIL SAMPLES <br /> SOIL SAMPLES <br /> Less than 1000 gallons THS per tank Center and ends or sides <br /> 1000 - 10,000 gallons FIVE per ta��}c Centex arx9 ends or sides <br /> 10,001 gallons and up FI� OR-MORE per Ends and diddle and <br /> general,l I spaced along <br /> the leng& of the tank <br /> EH 23 047 12/88 <br /> REVISED 1/89 <br />