My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012643
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
U
>
UNION
>
425
>
3500 - Local Oversight Program
>
PR0545776
>
ARCHIVED REPORTS_XR0012643
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2020 4:52:18 PM
Creation date
5/28/2020 4:41:04 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012643
RECORD_ID
PR0545776
PE
3528
FACILITY_ID
FA0002231
FACILITY_NAME
JACK FROST ICE SERVICE
STREET_NUMBER
425
Direction
N
STREET_NAME
UNION
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
15112003
CURRENT_STATUS
02
SITE_LOCATION
425 N UNION ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
252
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WHF Environmental Consultants,Inc. <br /> Sampling Protocol <br /> A . <br /> Drilling <br /> r <br /> Permits were obtained for the boring and monitoring well before the drilling <br /> began. The soil borings were accomplished using a mobile mounted drilling rig <br /> 4{ employing the use of a hollow stem flight auger no less than 3 1/4-inch i.d. and <br /> 8 7/8 o.d. <br /> f <br /> All drilling equipment was thoroughly steam-cleaned before drilling began to <br /> prevent the introduction of contamination from off site and between borings to <br /> pmvent cross contamination. <br /> i � <br /> g ' The borings were logged (Appendix A) under the direct supervision of a <br /> registered engineering geologist using the Unified Soil Classification System. <br /> The color, texture, moisture, plasticity(if applicable), consistency of the earth <br /> materials,pertinent soil or bedrock characteristics,and any evidence of <br /> contamination was noted. All water-bearing zones and the depths at which they <br /> were encountered were noted onthese logs. <br /> All borings were drilled in such a manner as to prevent cross contamination <br /> r� <br /> between strata. Exploratory soil borings within the unsaturated zone were <br /> backfilled with a 5% bentonite and cement grout with a bentonite plug at the <br /> base. <br /> E.3 <br /> The cuttings from the drilling operation were contained on-sits during drilling <br /> for proper disposition. The proper method of disposal is dependent upon results <br /> of laboratory analysis. This disposal will be the responsibility of the client <br /> unless other arrangements have been made. <br /> Well Consmcrion <br /> All materials used in well construction were thoroughly cleaned prior to <br /> introduction into the boring. A two inch diameter well casing (PVC) with end <br /> cap and factory perforations for placement in the saturated zone(taking into <br /> account.seasonal_variadon).-was placed in-the boring.---The-screen and filter pack---------- - ----— — <br /> sizes areas noted in the well construction drawing. The casing and end caps <br /> were threaded and no PVC cement was used..The filter pack extends two feet <br /> above the wet, ra hig,perforat-ons A bents '"� 2 o r__. mac_,_ <br /> .Tn l4 G-to J"1GGC tllllili was <br /> ivy <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.