Laserfiche WebLink
fi- <br /> 1 <br /> 111111 Environmental Cunsultaltts, Inc. <br /> Ilealtlr c? Safety Plant <br /> 1'agc: 3 <br /> 2.0 SA ITTY IMPLEMENT4TION <br /> The provisions of the WflF Environmental Consultants, Inc. Health and Safety Plan <br /> are mandatary for all personnel associated with the site project and operations. <br /> A complete background review and site visitation will be conducted in order to detri- <br /> mine whether specific amendments are to be made to the Health and Safety Plan based <br /> on specific characteristics which may exist on the job site. Any suspected hazards <br /> associated with the on-site operation which exposure to, via inhalation or skin absorp- <br /> tion, to such as suspected carcinogens or human sterilants, will be documented and <br /> specific guidance will be developed and added to this Health and Safety Plan as <br /> Appendices. <br /> A defined prcjcct site layout is paramount to the safe completion of all ,remedial site in- <br /> vestigatiuns. Thu;project site layout has built-in safety features. The site is divided into <br /> thrNe zones. The:following list defines the required personnel protective equipment. <br /> 2.1 Penvonnel Protcelive Equipment (PPE) <br /> Personnel who will be working in or around the exclusion zone of the job site <br /> will usa the following protective equipment and measures as warrant by the <br /> Project?'Manager: <br /> - Coveralls as an undergarment <br /> - Saranex outer garment <br /> - Sample gloves (inner) <br /> - PVC, Nitrile or Neoprene outer gloves <br /> - Hard hat <br /> - Steel toe boots <br /> - Aobars or Tingley boots <br /> Full face-piece respirator with R53HE cartridges (a combination of <br /> organic vapor, acid gas, pesticide, radionuclide, high efficiency filter). <br /> Note that cartridges should be changed daily. <br /> - All joints to be taped <br /> - Self-contained air will be utilized if project dictates <br /> F„� <br />