Laserfiche WebLink
CERS Consolidated Emergency Response / Contingency Plan <br /> INTERNAL FACILITY EMERGENCY COMMUNICATIONS OR ALARM NOTIFICATION WILL OCCUR BY (Check all that apply): CI 1 . <br /> n I . VERBAL WARNINGS; ❑' 2. PUBLIC ADDRESS OR INTERCOM SYSTEM; ❑' 3 . TELEPHONE; <br /> ❑ 4. PAGERS; H 5. ALARM SYSTEM; [j] 6. PORTABLE RADIO <br /> NOTIFICATIONS TO NEIGHBORING FACILITIES THAT MAY BE AFFECTED BY AN OFF-SITE RELEASE WILL OCCUR BY (Check all that apply): Cie. <br /> ❑o I . VERBAL WARNINGS; ❑� 2. PUBLIC ADDRESS OR INTERCOM SYSTEM; 0 3. TELEPHONE; <br /> ❑ 4. PAGERS; ❑' 5. ALARM SYSTEM; [16. PORTABLE RADIO <br /> EMERGENCY COORDINATOR CONTACT INFORMATION: C13 <br /> PRIMARY EMERGENCY COORDINATOR NAME: John Hicks PHONE NO. : (209) 835-5133 PHONE NO.: (540) 247-2197 <br /> ALTERNATE EMERGENCY COORDINATOR NAME: Paul Chu PHONE NO. : (209) 835-5133 PHONE NO.: (209) 207-8350 '.. <br /> ❑ Check if additional Emergency Coordinator contact and address infbnnation is available onsite or by calling PHONE NO.: '.. <br /> Note. If more than one alternate emergency coordinator is designated, attach a list in order of responsibility. <br /> D. EMERGENCY CONTAINMENT AND CLEANUP PROCEDURES <br /> Check the applicable boxes to indicate your facility's procedures for containing ,spills and reventin and miti atin releases, fires and/or ex losions. <br /> p g g B ._L'_- <br /> DL <br /> ❑� 1 . MONITOR FOR LEAKS, RUPTURES, PRESSURE BUILD-UP, ETC.; '.. <br /> ❑ 2. PROVIDE STRUCTURAL PHYSICAL BARRIERS (e.g., Portable spill containment walls, baill-in berms); <br /> 3. PROVIDE ABSORBENT PHYSICAL BARRIERS (e.g., Pads, spill pigs, spill pillows); <br /> ❑� 4. COVER OR BLOCK FLOOR AND/OR STORM DRAINS; <br /> ❑ 5. LINED TRENCH DRAINS AND/OR SUMPS; <br /> ❑' 6. AUTOMATIC FIRE SUPPRESSION SYSTEM; '.. <br /> ❑' 7. ELIMINATE SOURCES OF IGNITION FOR FLAMMABLE HAZARDS; <br /> ❑' S. STOP PROCESSES AND/OR OPERATIONS; '.. <br /> E19. AUTOMATIC / ELECTRONIC EQUIPMENT SHUT-OFF SYSTEM; '.. <br /> ❑� 10. SHUT OFF WATER, GAS, ELECTRICAL UTILITIES; <br /> ❑� <br /> 11 . CALL 9- 1 - 1 FOR PUBLIC EMERGENCY RESPONDER ASSISTANCE AND/OR MEDICAL AID; <br /> ❑� <br /> 12. NOTIFY AND EVACUATE PERSONS IN ALL THREATENED AND/OR IMPACTED AREAS; <br /> ❑� 13. ACCOUNT FOR EVACUATED PERSONS IMMEDIATELY AFTER EVACUATION; <br /> ❑ 14. PROVIDE PROTECTIVE EQUIPMENT FOR ON-SITE EMERGENCY RESPONSE TEAM; <br /> ❑� 15. REMOVE CONTAINERS AND/OR ISOLATE AREAS; '.. <br /> H 16. HIRE LICENSED HAZARDOUS WASTE CONTRACTOR; <br /> ❑� 17. USE ABSORBENT MATERIAL FOR SPILL CONTAINMENT; <br /> ❑ 19. VACUUM SUCTION USING APPROPRIATE VACUUM (e.g., Intrinsically safe) FOR SPILL CONTROL AND/OR CLEANUP; <br /> ❑ 19. DECONTAMINATE PERSONNEL AND EQUIPMENT WITHIN DESIGNATED AREA AND DISPOSE OF WASTEWATER AS I IAZARDOUS WASTE; <br /> ❑o 20. PROVIDE SAFE TEMPORARY STORAGE OF I IAZARDOUS WASTE GENERATED DURING EMERGENCY ACTIONS; '.. <br /> ❑ 21 . OTHER (Specify): DI <br /> E. FACILITY EVACUATION <br /> THE FOLLOWING ALARM SIGNAL(S) WILL BE USED TO BEGIN EVACUATION OF THE FACILITY (Check all that apply): <br /> ❑ L BELLS; E2. <br /> ❑� 2. HORNS/SIRENS; <br /> Q 3. VERBAL (i.e., Shouting); <br /> ❑� 4. OTHER (S uecif ): PA System <br /> THE FOLLOWING LOCATION(S) WILL BE USED FOR AN EMERGENCY ASSEMBLY AREA(S) (e.g., Parking lot, street corner): U <br /> Assemble in parking lot. <br /> Note: The Emergency Coordinator must account for all onsite employees and visitors after evacuation. <br /> EVACUATION ROUTE S AND ALTERNATE EVACUATION ROUTES ARE DESCRIBED AS FOLLOWS: E4. <br /> ❑ I . WRITTEN PROCEDURES DESCRIBING ROUTES, EXITS, AND ASSEMBLY AREAS; <br /> ❑u 2. EVACUATION MAP(S) DEPICTING ROUTES, EXITS, AND ASSEMBLY AREAS; <br /> E] 3. OTHER (Specify): Es. <br /> Note: Evacuation procedures and/or maps should be posted in visible facility locations and must be included in the Contingency Plan. <br /> F. ARRANGEMENTS FOR EMERGENCY SERVICES <br /> ADVANCE ARRANGEMENTS FOR LOCAL EMERGENCY SERVICES (Check one of the following): FF <br /> ❑� 1 . HAVE BEEN DETERMINED NOT NECESSARY; <br /> ❑ 2. THE FOLLOWING ARRANGEMENTS HAVE BEEN MADE (Specify): F2. <br /> Note: Advance arrangements with local Fire and police departments, hospitals, state and local emergency response (cams, and/or emergency services <br /> contractors should be made for your facility, if necessary. Large Quantity Generators must describe arrangements in the Contingency Plan, <br /> Rev. 03/07/17 Page 2 of 4 <br />