My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_2020
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
ARMY
>
1624
>
2300 - Underground Storage Tank Program
>
PR0231014
>
REMOVAL_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/26/2021 8:55:57 AM
Creation date
6/1/2020 10:27:33 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
2020
RECORD_ID
PR0231014
PE
2361
FACILITY_ID
FA0003777
FACILITY_NAME
ARMY COURT
STREET_NUMBER
1624
STREET_NAME
ARMY
STREET_TYPE
CT
City
STOCKTON
Zip
95206
APN
16334002
CURRENT_STATUS
02
SITE_LOCATION
1624 ARMY CT
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
APPENDIX A <br /> s <br /> SCOPE OF WORK: <br /> • REMOVAL OF ONE(1)10,000 GALLON UNDERGROUND DIESEL FUEL <br /> STORAGETANK <br /> 1. MARK LOCATION OF UTILITIES <br /> 2, NOTIFY DIG ALERT BEFORE EXCAVATION <br /> 3, PREPARE SITE FOR TANK REMOVAL AS REQUIRED <br /> 4, SET UP TEMPORARY FENCING <br /> 5. SAW CUT,DEMO CONCRETE,AND ASPHALT ABOVE THE TANK PIT. <br /> 6, SAW CUT AND DEMO DISPENSER CONCRETE PAD AND EXPOSE <br /> UNDERGROUND FUEL PIPING <br /> 7, FLUSH PRODUCT LINE BACK TO TANK AND PUMP UST OF REMAINING <br /> PRODUCT AND REMOVE SLUDGE <br /> 8 EXCAVATE(1)10,000 GALLON DIESEL FUEL STORAGE AND STOCKPILE <br /> PL SOIL ONSITE ACCORDING TO SAN JOAQUIN VALLEY AREA AIR QUALITY <br /> DISTRICT REQUIREMENTS <br /> 9, WASH UST WITH RINSE LIQUID,AND DISPOSE OF RINSATE BY <br /> FILL BUCKE �18r PERMITTED HAULER TO PERMITTED RECYCLERlDUMPSITE(TOTAL <br /> FUEL PUMP ISLAND1l1K 61EBEL TANK VOLUME UP TO 700 GALLONS) <br /> 10. DISCONNECT ALL ELECTRICAL AND PIPING FROM TANK <br /> PRQDUCTSU P .O 11. REMOVE TANK FROM EXCAVATION <br /> BUILDING 12 REMOVE SAID PIPING FROM PIPING TRENCH <br /> zo- 40 o-GUARD SHACK <br /> BATE— £},,. �;_K 13. HAVE SOILS TESTING BY A STATE CERTIFIED LABORATORY AS <br /> REQUIRED BY CUPA <br /> i 14. DISPOSAL OF(1)UST TANK BY CERTIFIED HAULER TO PERMITTED <br /> FUEL PUMP ISLAND .I I RECYCLER AND PROVIDE CERTIFICATE OF DESTRUCTION <br /> 15. CALL FOR INSPECTION PRIOR TO BACKFILL <br /> 16, BACKFILL EXCAVATION WITH EXISTING STOCKPILED SOIL <br /> 17. IMPORT CLASS TWO BASEIGRAVEL TO FINISH BACKFILLING TO 6" <br /> BELOW GRADE <br /> 18. REPLACE CONCRETE TO MATCH EXISITNG 250OPSI 6"THICK <br /> REINFORCED CONCRETE WITH#4 REBAR 18"INCHES <br /> 19, ON CENTER EACH WAY ON EXACTION AND REPLACE CURBING <br /> „ k 20, SUBMIT CLOSURE REPORT TO THE CUPA AND CITY OF STOCKTON FIRE <br /> DEPARTMENT <br /> - N <br /> OV <br /> FILLBUCKET <br /> Q PRQCUCT SUMP 100' <br /> s N T <br /> DPIF2 CA 18 ARMY COURT LLC <br /> 1625 ARMY COURT <br /> STOCKTON, CA. <br /> W.CHARTER WAY DATE:3.30.2020 PLOT PLAN AS NOTED <br /> CGRS CGRS, INC. <br /> 6OLTO"5°E"-5444 DRY CREEK ROAD <br /> SACRAMENTO, CA. 95838 <br />
The URL can be used to link to this page
Your browser does not support the video tag.