Laserfiche WebLink
October 23, 2019 <br /> Page 2 of 2 <br /> Removal of the tank excavation will block fire road access to the tank farm while <br /> excavating. While the trench is open vehicles would have to pass within feet of <br /> excavation. <br /> ® There are three monitoring wells near by the tank that may be damaged during <br /> excavation. <br /> ® There is an existing 3" pump outline for the tank farm that will be very close to the <br /> excavation and may need to be rerouted in order to remove tank. <br /> 0rga, nJ7a at <br /> Aaron Swol — Project Manager <br /> Marlowe Jones — Safety Coordinator <br /> ACCEPTED ON BEHALF OF FIRE DEPARTMENT <br /> n_ BY: <br /> Signature <br /> �r <br /> Name (printed) �e>( 0 <br /> Date <br /> )I <br /> P701467 CarcP7deMiral <br />