auaKt7nmpNS - IPTEtdT ¢PECa MONS:
<br /> SUBMITTALS 1 . WHERE SPECIFIED ONLY BY REFERENCE STANDARDS, SELECT ANY PRODUCT MEETING 20, THREADS OF IRON AND STEEL PIPES, FITTINGS, AND COUPLINGS SHALL CONFORM TO ANSI 47. INSTALL SUPPORTS ON EACH SIDE OF IMPOSED LOADS IN HORIZONTAL PIPING, INCLUDING 18, IF THE PIPE SYSTEM TEST PRESSURE FALLS AFTER THE PRESSURIZING MEANS IS SHUT
<br /> 1 , COMPLETE DESCRIPTIONS AND COPIES Of APPLN;ABLE . hTHIS PRTURER'S CATALOG PAGES N
<br /> FOR ALL MATERIALS WHICH ARE TO BE INSTALLED FOR THIS PROJECT, VERIFY THAT STANDARDS BY AtJY MANUFACTURER. 81 .20, 1 . PRODUCE SUFFICIENT PERFECT THREADS TO ENSURE FULL METAL-TO-METAL VALVES, INSTRUMENTS, FLANGED CONNECTIONS, AND NON-RIGID CONNECTORS, OFF, THE SOURCE OF PRESSURE LOSS MUST BE DETERMINED AND CORRECTED,
<br /> MATERIAL CONFORMS TO THE APPUCABLE SPECIFICATIONS AND MEETS OR EXCEEDS CONTACT WHEN SCREWED HOME IN FITTING'S; AND AFTER THREADING, COUNTERSINK ENDS
<br /> 2. WHERE SPECIFIED BY NAMING SEVERAL PRODUCTS OR MANUFACTURERS, SELECT ANY OF PIPES, REAM AND CLEAN 'CHIPS AND BURRS. MAHE CONNECTIONS UP FULL, WITH NOT 48. SUPPORT PIPING AT ALL FQUI MENT AND CONTROL VALVES TO PREVENT STRAINS OR 19. PNEUMATIC TESTING WITH AIR OR GASEOUS NITROGEN REQUIRES OWNER APPROVAL IF
<br /> APPLICABLE REQUIREMENTS. PRODUCT AND MANUFACTURER NAMED THAT MEETS THE SPECIFIED REQUIREMENTS• OTHER MORE THAN THREE THREADS EXPOSED. USE METHOD THAT WILL NOT SUBJECT PIPES OR DISTORTIONS IN THE CONNECT�D EQUIPMENT AND CONTROL VALVES. PIPING AT EQUIPMENT APPROVED, TESTING SHALL BE IN ACCORDANCE WITH ASME 831 .4.
<br /> 2, WELDER QUALIFICATIONS; ACCORDING TO PRESSURE PIPING CODE BEFORE STARTING WORK, PRODUCTS AND MANUFACTURERS WILL NOT BE CONSIDERED, DRAWINGS MAY BE BASED ON FITTINGS TO TWISTING OR CROSS STRAINS, LUBRICATE MALE THREADS ONLY WITH THREAD SHALL BE SUPPORTED AND ALLOW FOR REMOVAL OF EQUIPMENT, VALVES AND
<br /> SUBMIT- NAME OF WELDER, QUALIFICATION DATE, IDENTIFICATION MARK ASSIGNED, & TEST EQUIPMENT CONFIGURATION OF A PARTICULAR MANUFACTURER; MAKE AMY CHANGES LUBRICANT OR TAPE. - ACCESSORIES WITH A MINIMUM Of DISMANTLING AND WITHOUT REQUIRING ADDITIONAL 20. EXAMINE JOINTS FOR LEAFAGE USING SOAP BUBBLE OR EQUIVALENT METHOD, IF PRESSURE
<br /> RESULTS, REQUIRED TO ACCOMMODATE CONFIGURATION OF THE ACTUAL EQUIPMENT SUPPLIED AT NO SUPPORT AFTER THESE ITEMS ARE REMOVED. GAUGE SHOWS DISCERNIBLE DECREASE IN PRESSURE OVER THE PERIOD OF THE TEST,
<br /> EXPENSE TO OWNER, 21 , BUTTWELD ALL CARBON STEEL PIPE 2 1/2 INCH SIZE AND LARGER AND WELDOLETS, MAINTAIN PRESSURE FOR AN ADDITIONAL FOUR HOUR PERIOD, IF PRESSURE CONTINUES TO
<br /> 3, CERTIFIED WELD REPAIRS REPORTS, COMPLETE WITH EVALUATIONS & ALL WELD MAPPING. SOCKOLETS AND'. tTdREADOLETS. USE BRANCH , OUTLET fffilNGS FOR IMPROVED FLOW WHERE 49, PROVIDE TEMPORARY PROTECTION DURING ALL PHASES OF CONSTRUCTION AND TESTING, FALL, RETEST 111E JOINTS,
<br /> 3, WHERE SPECIFIED BY NAT•IING ONE OR MORE PRODUCTS OR MLANUFACTURERS, BUT ATTACHED TO THE RUN, DESIGNED TO WITHSTAND FULL PIPE BURSTING STRENGTH, USE COVER EQUIPMENT TO THE EXTENT NECESSARY TO PREVENT FOREIGN MATERIALS FROM
<br /> INDICATING "OR :APPROVED" AFTER SPECIFIED LIS71N0; SPECIFIED PR DUCT IS THE FULL LENGTHS OF PIPE TO MINIMIZE FIELD MELDS. WELDING TO BE IN ACCORDANCE WITH CONNTAMINATING THE MECHANISMS OR FINISHES, PROTECT OPEN ENDS ENDS OF PIPING 21 , CONTRACTOR SHALL PROVIDE THE ADDITIONAL, TEMPORARY MEMBERS REQUIRED T0 ;
<br /> 4, CERTIFIED CONTRACTOR INSPECTION REPORTS p AGAfNST ENTRY OF FOREIGN MATERIALS, AND REMOVE ANY SUCH MATERIALS BEFORE SUPPORT THE WEIGHT OF THE TEST LIQUID. FOR VAPOR OR GAS PIPING THAT IS SPECIFIED
<br /> PREFERRED QUALITY STANDARD. SUBMIT REQUEST FOR ANOTHER PRODUCT FOR APPROVAL. ASME BOILER AND UNFIRED PRESSURE VESSEL CODE, SECTION IX.
<br /> 5, CERTIFIED HYDROSTATIC AND PNEUMATIC TEST REPORTS WITH DATA AND RESULTS, FURTHER ASSEMBLY, PROTECT ' EXPOSED FLANGE FACES FROM DAMAGE AND MOISTURE TO BE HYDROSTATICALLY TESTED,
<br /> 4, WHERE SPECIFIED BY NAMING ONLY ONE PRODUCT AND MANUFACTURER: THERE IS NO 22, ALL WELDERS SHALL BE CERTIFIED BY THE COMPANY WITH WHICH THEY ARE EMPLOYED,
<br /> 6. CERTIFIED REPORTS REQUIRED BY PRESSURE PIPING CODE. OPTION AND NO SUBSTITUTION WILL BE ALLOWED. WELDERS' CERTIFICATIONS SHALL BE DATED WITHIN THE, PRECEDING 12 MONTHS, WELDERS 50. REMOVE FOREIGN MATTER FROM PIPING AS WORK PROGRESSES, REMOVE WELDING ICICLES 22, RECTIFY DEFECTS . THAT DEVELOP DURING TESTING AND RETEST THE PIPING SYSTEMS UNTIL
<br /> CERTIFICATIONS SHALL INDICATE SATISFACTORY WELD RESULTS IN ACCORDANCE WITH' ASML AND BEADS, CUTTINGS AND BURRS, GRIND ACCESSIBLE INTERNAL WELD SURFACES SMOOTH. THEY SHOW NO DEFECT OR WEAKNESS AND ARE TIGHT,
<br /> clnL7DONcgt rrK14 pROOEDURE BOILER AND PRESSURE VESSEL CODE, SECTION IX: WELDING AND BRAZING QUAUFICATONS RAP PIPING AND REMOVE FOREIGN MATERIALS INSIDE AND OUTSIDE, AIR BLOW SYSTEMS OR
<br /> BcJ
<br /> I $ SUBMIT REQUESTS FOR SUBSTITUTIONS WITHIN 30 PAYS OF CONTRACT AWARD, OR SOONER AND ASME 831 .4 PIPING, AS REQUIRED BY OWNER, CERTIFICATIONS SHALL INDICATE FLUSH TO OBTAIN A CLEAN PIPING SYSTEM, 23, REPLACE MATERIALS DAMAGED DURING TESTING AND FLUSHING,
<br /> ANSI AMERICAN NATIONAL STANDARDS INSTITUTE IF REQUIRED TO MANTAIN SCHEOULES, SATISFACTORY WELD RESULTS IN ACCORDANCE WITH; ASME 831 .4 PIPING, WELDERS SHALL
<br /> ASTM AIdMCAN SOCIETY OF TESTING AND MATERIALS BE CERTIFIED TO API STANDARD 1104 WELDING OF PIPELINES AND RELATED FACILITIES,
<br /> 51 . OWNER SHALL APPROVE SYSTEIds BEFORE TESTING IS STARTED, 24. USE NEW GASKETS EACH TIME A FLANGED JOINT IS MADE UP,
<br /> AWS AMERICAN WELDING SOCIETY 2. ACCEPTANCE pF SUBSTITUTIONS IS A7 OWNERS DISCRETION BASED ON THEIR EXPERIENCE 52 , PROVDE TEMPORARY PIPING FOR TES7N0, FLUSHING, DRAINING, AND BLOW NG OUT 25, REPAR OEFEUTIVE WELDED JOINTS IN ACCORDANCE WITH THE APPROPRIATE PIPING CODE*
<br /> M55 MANUFACTURE STANDARDIZATION SOCIETY OF THE VALVE AND AND JUDGMENT. SUBMIT SUFFICIENT INFORMATION TO SHOW THAT PROPOSED SUBSTITUTE IS 23, ALL WELDS FOR BURIED LINES TO BE INSPECTED PRIOR TO COVER. PERMANENT PIPING, LOCATION, AND ARRANGEMENT AS APPROVED BEFORE INSTALLATION, REEXAMINE REPAIRED COMPONENTS BY THE ORIGINAL METHOD TO DETERMINE FREEDOM
<br /> FRTING INDUSTRY FQUIVALEM TO THE ITEM SPECIFIED. AFTER ABOVE OPERATIONS ARE COMPLETED, REMOVE TEMPORARY PIPING, PLUG OR CAP FROM DEFECTS, AND RETEST ALL REPAIRED JOINTS. COSTS FOR SUCH REPAIR ARE THE
<br /> IF IN THE OPINION OF THE OWNER
<br /> AWWA AMERICAN WATER WORKS ASSOCATION 24, , THE WORK OF A WELDER CHEATES A R£A50NABLE
<br /> NEMA idol MOTORS AND HNERNIORS ; 3, MAKE CHANCES NEEDED TO ACCOMMODATE THE SUBSTITUTION AT NO EXPENSE TO THE DOUBT AS TO HIS SKILL, ADNERAL DITIONAL TESTS MAY BE ORDERED BY THE OWNER AT THE OPENINGS IN PERMANENT SYSTEMS WITH SPECIFIED MATERIALS, RF.SPONSID!LTY OE THE CONTRAGiOR
<br /> NEMA ICSI GESTANDARDS FOR INDUSTRIAL CONTROLS AND SYSTEMS OWNER, INCLUDING WORK UNDER OTHER DIVISIONS, CONTRACTOR'S EXPENSE. 53, 00 NOT COVER OR ENCLOSE WORK UNTIL IT HAS BEEN INSPECTED AND APPROVED. 26, KEEP TEST RECORDS FOR EACH PIPING INSTALLATION. THESE RECORDS ARE TO INCLUDE:
<br /> ASME SECTION V NONDESTRUCTIVE EXAI,PINATION DATE OF TEST, DESCRIPTION AND IDENTIFICATION OF PIPING TESTED, TEST FLUID, TEST
<br /> ASME SECTION IX WELDING AND , BRAZING QUAUFORONS E69![ 4TI14LlS 25, STEEL PIPE ENDS MAY DE BEVELED FOR WELDING BY MECHANICAL MEANS OR BY. FLAME 64, SHOULD WORK 8E COVERED OR EN
<br /> DING, CLOSED PRIOR TO INSPECTION AND APPROVAL, PRESSURE, AND TEST DURATION, REMARKS; TO INCLUDE! TYPE AND LOCATION OF LEAKS,
<br /> ASME 831 ,4 PRESSURE PIPING - PIPELINE TRANSPORTATION SYSTEMS FOR I , THE CONTRACTOR SHALL: Ct 10, WHERE, BEVEUNG IS DONE BY FLAME CUI INC, THOROUGHLY CLEAN SURFACES Of UNCOVER THE WORK; AFTER i( HAS BEEN INSPECTED AND APPROVED, MAKE REPAIRS AND REPAIRS MADE ON LEAKS, SIGNATURE AND DATE BY WITNESS, CERTIFICATION BY
<br /> LIQUID HYDROCARBONS AND OTHER LIQUIDS EXAMINE THE CONSTRUCTION SiTE: BECOME FAMILIAR WITH EXISTING CONDITIONS AFFECTING SCALE AND OXIDATION JUST BEFORE WELBEVEL TO CONFORM TO RECOGNIZED REPLACEMENTS AT NO ADDITIONAL COST, CONTRACTOR ANO APPROVAL BY THE OWNER.
<br /> CBC CALIFORNIA BUILDING CODE THE WORK, VERITY INSTALLATION CONDITIONS AS SATISFACTORY TO RECEIVE WORK OF THIS STANDARDS, BACK BEVEL PIPE ENDS OF FITTINGS AS NECESSARY TO MATCH ID Of PIPE.
<br /> NFPA NATIONAL FIRE PROTECTION ASSOCIATION SECTION. NO WORK SHALL BE INSTALLED UNTIL UNSATISFACTORY CONDITIONS ARE
<br /> UL UNDERWRITERS LABORATORIES NEC NATIONAL ELECTRICAL CODE CORRECTED, VERIFY LOCATIONS OF OVERHEAD OR BURIED UDUTIES ON OR NEAR SITE WITH 26, ASSURE THAT THE BORES OF PIPES TO BE WELDED ARE PROPERLY ALIGNED BEFORE 55, GROUT OR SHIM ALL MECHANICAL EQUIPMENT (PUMPS, TANKS WHERE RED'% ETC.) TO 27, AFTER PIPING HAS BEEN TESTED, DRAIN DRY,
<br /> CFC CALIFORNIA FIRE CODE OWNER, TAKE HORIZONTAL AND VERTICAL MEASUREMENTS FROM ESTABLISHED BENCH WELDING AND SECURE BOTH SIDES OF EACH WELD JOINT WITH CLAMPS, BLOCKS,', VICES, LEVEL SEE GROUT SPECIFICATIONS, 28. PROTECT EQUIPMENT, INSTRUMENTATION AND CONTROLS FROM DEBRIS WIN TEMPORARY
<br /> GMC CAUFORNIA MECHANICAL CODE MARKS. ALL WORK IS REQUIRED TO AGREE WITH THESE ESTABLISHED LINES AND LEVELS, OR OTHER APPROVED MEANS TO PREVENT SHIFTING OF THE PIPING DURING WELDING, - DURING FLUSHING AND DRYING OPERA
<br /> NEC NATIONAL ELECTRICAL CODE NOTIFY OWNER OF DISCREPANCIES BETWEEN ACTUAL. MEASUREMENTS AND THOSE INDICATED, 58. INSTALL GROUNDING BOND ACROSS ALL F.XI'ANSION JOINTS AND ALL NOPROJECTIVE STRAINERS OR ISOLATION PLATDURING
<br /> AFTER COMPLETION.
<br /> tIONS. REMOVE
<br /> NOT PROCEED UNTIL DIRECTED BY THE OWNER. 27. WHERE THE PIPE TEMPERATURE FALLS TO 32•F OR LOWER, HEAT PIPE TO APPROXIMATELY ELEMENTS, TECTIVE STRAINERS OR PLAT
<br /> GENJ7tu REQUIREMp4T5' I IDYF FOR A DISTANCE OF I FOOT EACH SIDE OF THE WELD BEFORE WELDING, FINISH OIIAJTIV GDNTRYH AND TESTItiO 29. CLEANUP: AT COMPLETION OF WORK, CLEAN EXPOSED PIPING THOROUGHLY,
<br /> 11 ALL MATERIALS AND METHODS USED IN THE CONSTRUCTION, HANDLING, IINSTALLATION, Emmm WELDING BEFORE THE PIPE COOLS TO 3270 i , CONTRACTOR IS RESPONSIBLE FOR: FA8RICATING, INSTALLING AND TESTING Of ALL PIPING
<br /> CLEANING, PAINTING, INSULATING, TESTING, COMMISSIONING AND ACCEPTANCE OF 1 , THE CONTRACTOR SHALL:
<br /> MECHANICAL/ PIPING SYSTEMS FOR THIS PROJECT SHALL CONFORM TO THE REQUIREMENTS TIME THE WORK WITH PROGRESS SCHEOU�E APPROVED BY THE OWNER, PROTECT 28, USE SOCKET WELDS ON PIPING 2 INCH AND SMALLER AS , REQUIRED BY THE APPLICABLE SYSTEMS IN ACCORDANCE WITH ASME 831 .4 FOR FACILITY PIPING. C�lN4
<br /> OF STANDARDS AND REGULATIONS WHICH ARE INCLUDED WITH OR REFERENCED BY THE SURROUNDING AREAS AND SURFACES TO PREVENT DAMAGE, OBTAIN ROUGHING-1 PROJECT SPECIFPCATION. CUT AND REAM PIPE ENDS TO PROMDE STRAIGHT END SURFACE 1 . ALL ;PIPING AND FITTINGS SHALL BE PER SHELL PIPE CLASS 11000, IPE SCHEDULE WALL
<br /> DRAWINGS. DIMENSIONS FOR EQUIPMENT FROM APPROVED SHOP DRAWINGS OR ACTUAL EQUIPMENT FREE OF BURRS, 2, THE CONTRACTOR SHALL' p
<br /> MEASUREMENTS, INSTALL THE WORK IN ACCORDANCE WITH QUALITY ASSURANCE PROVISIONS, PERFORM ALL TESTS REQUIRED BY ALL SPECIFICATION SECTIONS APPLICABLE TO IS WORK, THICKNESSES ARE MINIMUM THICKNESSES AND )JAY BE INCREASED TO STANDARD WALL FOR
<br /> 2. THE CONTRACTOR . SHALL: PROVIDEFLICT, THE MORE 29, REPLACE DEFECTIVE WELDS AND RE-INSPECTION AT NO ADOMONAL COST TO OVINER,E AND INSTALL PRODUCTS OF RECOGNIZED DRAWINGS, AND MANUFACTURER'S INSTRUCTIONS. WHERE THESE CONPROVIDE MATERIALS, SUPPLIES, LABOR, AND POWER REQUIRED FOR TESTING. NOTI AVAIlA81LTTY1
<br /> MANUFACTURERS REGULARLY ENGAGED IN THE PRODUCTION OF LATEST AND BEST STRINGENT REQUIREMENTS GOVERN, REPAIRING DEFECTIVE WEiDS BY ADDING WELD MATERIAL OVER THE DEFECT OR BY OWNER AND OF AUTHORITIES HAVING JURISDICTION IN AMPLE TIME TO BE PRESENT FOR FINAL
<br /> STANDARD DESIGN MATERIALS AND EQUIPMPEM, PROVIDE PRODUCTS , OF ONE TYPE BY A PEENING WILL NOT BE PERMITTED. TESTING OF ALL WORK, REPAIR DEFECTS DISCLOSED BY TESTS, MAKE TESTS IN STAGES TO 2. GALL, GLOBE, AND CHECK VALVES SHALL BE PIPE CLASS 11000.
<br /> SINGLE MANUFACTURER, BE RESPONSIBLE FOR ENSURING EQUIPtA7dT IS COMPLETE WITH 21 DIAGRAMS SHOWING PIPE CONNECTIONS ARE SCHEMATIC, BASE THE WORK ON FIELD FACILITATE WORK OF OTHERS. 3. ALL CASKETS SHALL BE PIPE CLASS 11000.
<br /> FITTINGS, TRIMMINGS, AND PARTS NECESSARY FOR COMPLETE OPERATING INSTALLATIONS* Md ASUREMEM5 AND ACTUAL CONDITIONS. 30, STORE WELDING ELECTRODES IN A DRY HEATED AREA; KEEP FREE OF MOISTURE AND
<br /> PROVIDE EQUIPMENT WITH ELECTRICAL COMPONENTS BEARING THE UNDERWRITERS DAMPNESS DURING FABRICATION OPERATIONS, DISCARD ELECTRODES THAT HAVE LOST PART 3, CONTRACTOR IS RESPONSIDLE FOR WORK OF OTHER TRADES DISTURBED OR DAMAGED BY
<br /> LABORATORIES, ' INC. LABEL OR PROVIDE CERTIFICATION ' FROM MANUFACTURER TINS THE 3, THE DRAWINGS DO NOT SHOW EXACT DEIALS OF PIPING. NO EXTRA PAYMENTS WILL BE OF THEIR COATING, THE TESTING, REPAIR, AND REPLACEMENT, DISTURBED OR DAMAGED WORK SHALL, DE 4. PIPE SUPPORTS SHALL INCLUDE I-ROD DIELECTRIC PADS AND COATED UI-BOLTS AS
<br /> CONTRACTOR'S EXPENSE
<br /> EQUIPMENT CONFORMS TO UL STANDARDS, REMOVE REJECTED OR DAMAGED MATERIAL FROM ALLOWED WHERE OBSTRUCTIONS IN THE WORK OF OTHER TRADES REQUIRE OFFSETS IN RESTORED TO ITS ORIGINAL CONDITION A7 NQTED,
<br /> SITE, PROVIDE ITEMS SUCH AS SHIMS, FASTENERS, GROUT, GREASE FITTINGS, LUBRICANTS, THE PIPING, COORDINATE WITH OTHER TRADES, 31 , INSTALL FLANGES WITH FACES STRAIGHT, TRUE AND PARALLEL TO MATING SURFACES, 4, CONTRACTOR IS RESPONSIBLE FOR THE CARE, MAINTENANCE AND PROTECTION OF ALL 5. FOLLOW TSO WELD MANUAL GUIDELINES FOR WIELDING TESTING REQUIREMENTS, 100% NCE
<br /> AND HYDRAULIC FLUIDS NECESSARY FOR INSTALLATION, AND TESTING PROCEDURES, LABEL ON WELDS,
<br /> gCESS LUBRICANTS AND DELIVER TO CONSTRUCTION MANACER UPON COMPLETION OF 4. ALLOW SPACE FOR MANIENANCE IN PIPING LAYOUT, PLAN WORK AP{0 USE PROPER 32, POSITION FLANGES FOR BOLT HOLES TO STRADDLE HORIZONTAL AND VERTICAL CENTER EQUIPMENT AND SYSTEMS UNTIL THEY ARE ACCEPTED BY OWNER,
<br /> WORK, FITTINGS TO ENSURE MAXIMUM HEADROOM, OWNER RESERVES THE IGHT TO REQUIRE LINES,
<br /> REMOVAL AND REPLACEMENT OF WORK THAT USES EXCESSIVE SPACE, 5, CONTRACTOR SHALL PERFORM PRELIMINARY, CHECKOUT FOR EACH PHASE OF THE FINAL 6. ALL ,PIPING SPOOLS OR SYSTEMS SHALL BE PRESSURE TESTED PER ASME 831 .4 & SHELL
<br /> 3, PIPE, VALVES AND FITTINGS SHALL CONFORM TO THE REQUIREMENTS OF THE 33. MAKE UP FIANCES TO SECURE UNIFORM PRESSURE ON GASKET WITHOUT OVER STRESSING INSTALLATION. PROCEDURES INCLUDE BUT ARE NOT UMITED TO: REMOVING FOREIGN STANDARDS
<br /> RECOMMENDATIONS, VERIFYING PROPER DIRECTION OF MOVEMENT OR ROTATION, VERIFYING
<br /> SPECIFICATIONS: 5, KEEP OPENINGS IN PIPES AND EQUIPMENT CLOSED DURING CONSTRUCTION. BOLTS, MATERIALS AND TOOLS, LUBRICATING IN ACCORDANCE WITH THE MANUFACTURER'S 7, ALL PIPING TO DE LABELED WITH STENCILED PIPING DESIGNATIONS PER SHELL STANDARDS.
<br /> 4. PIPE SPECIALTIES SHALL CONFORM TO THE REQUIREMENTS OF THE DRAWINGS. 6, INSTALL EQUIPMENT REQUIRING PERIODIC SERVICING OR REPAIRS SO IT IS READILY 34. USE RAT-FACE 150-LB STEEL FLANGES AND FULL•-FACE GASKET ONLY WHERE OPERATION IS SMOOTH AND FREE OF UNDUE NOISE AND VIBRATION. SYNCHRONIZING (AS 10. SHELF DESIGN AND ENGINEERING PRACTICES (DEPS):
<br /> ACCESSIBLE. OTHERWISE, OBTAIN OWNER'S APPROVAL OF LOCATION, NECESSARY TO MATE WITH 125-LB FLANGES. APPLICABLE) WITH OTHER RELATED EQUIPMENT.
<br /> 5, PIPE SUPPORTS SHALL CONFORM TO THE REQUIREMENTS OF THE DRAWINGS,
<br /> 7. REPLACE DEFECTIVE WORK WITH NEW WORK, WITHOUT ADDITIONAL COST, WHERE REQUIRED 35, WHEN A FLANGED JOINT HAS , BEEN MADE UP AND SUBSEQUENTLY LOOSENED, INSTALL A 6, CONTRACTOR SHALL CONSULT OWNER AS TO PROPER FUNCTIONING OF THE ITEM BEING
<br /> 6, FORMED STEEL CHANNELS FOR PIPE SUPPORTS AND MISCELLANEOUS STEEL FRAMING BY THE OWNER, NEW GASKET PRIOR TO REMAINING JOINT, CHECKED, 31 .38.01 . 10 PIPING CLASSES - BASIS OF DESIGN
<br /> SHALL BE 1 -3/8 X 1 -5/81 INCH MINIMUM CROSS- SECTION SIZE, 14-GAGE MINIMUM31 .38.01 . 11 PIPING - GENERAL REQUIREMENTS
<br /> THICKNESS; MANUFACTURED BY UNISTRUT, POWERSTRUT, STORACK, FEE & MASON, OR 8, PAINT: USE PROJECT PAINTING SPECIFICATION - CLOSELY SUPERVISE PAINTING WORK TO 38, ON PIPING SYSTEMS OPERATING AT 300 F OR LOWER, APPLY AMI-SEIZE THREAD 7, CONTRACTOR SHALL REPAIR DAMAGE TO EQUIPMENT RESULTING FROM IMPROPER CHECKOUT
<br /> ELCE. ATTACHMENT OF ROD HANGERS TO , CHANNELS: MANUFACTURER'S STANDARD LOCKING ENSURE CONFORMANCE WITH SPECIFICATIONS, LUBRICANT TO BOLT THREADS, PROCEDURES, 31 ,38.01 .31 SHOP AND FIELD FABRICATION. OF PIPING
<br /> TYPE INSERTED: NUTS, SAME MANUFACTURER AS CHANNEL DO NOT EXCEED31 ,40.00,10 PIPELINE ENGINEERING (AMENDMENTS/SUPPLEMENTS TO ISO 13623)
<br /> MANUFACTURER'S RECOMMENDED LOADING. 9, INSTALL PIPING TO ENSURE COMPLETE DRAINABIUlY UPON COMPLETION OF HYDROTEST. 37, BEM PIPING MAY NOT BE USED EXCEPT AS SHOWN ON DRAWINGS OR APPROVED IN 86 AT COMPLETION OF THE WORK, CONTRACTOR SHALL CAREFULLY REMOVE, IDENTIFY, AND
<br /> INSTALL HIGH POINT VENTS AS NECESSARY TO FACILITATE HYDROTEST, DRAINAGE THROUGH ADVANCE. DELIVER TAGS, BAGGED SPARE PARTS, AND INSTRUCTIONS TO THE OWNER, 30.48.00,31 PROTECTIVE COATINGS FOR ONSHORE ANO OFFSHORE FACIU11ES
<br /> 74 SUPPORTS WHICH ARE NOT CONSTRUCTED OF FORMED STEEL CHANNELS SHALL BE LOW POINT FLANGES IS PREFERRED TO INSTALLATION OF DRAIN VALVES. WIELDING OF PIPEIJNES AND RELATED FACILITIES (AMENDMENTS/SUPPLEAEtTS
<br /> 38. PROVIDE SUPPLEMENTARY STEEL FRAMING FOR SUPPORTS; ASSEMBLE BY WELDING, 9, CO FACTOR SHALL FURNISH LADDERS AND OTHER EQUIPMENT SO READINGS MAY BE 61 .40.20,30 TO ISO 13487:2000
<br /> FABRICATED FROM STANDARD STRUCTURAL STEEL SHAPES TO AISC DIMENSIONS OR 10, INSTALLATION OF LOW POINT DRAIN VALVES REQUIRES OWNER APPROVAL. DRAIN ATTACHED TO ANCHOR BOLTS EMBEDDED IN THE CONCRETE CONSTRUCTION, OR WELDED TAK AS REQUIRED AND SHALL PROVIDE ACCESS TO CONTROLS, VALVES, AND OTHER )
<br /> SCHEDULE 40 ASTM A53 STEEL PIPE. FERROUS METAL WORK EXPOSED T THE WEATHER CONNECTIONS REQUIRED FOR HYDROTEST MAY BE INSTALLED BUT MUST BE PLUGGED & OR CLAMPED TO BUILDING STRUCTURAL MEMBERS, WELDING: CONTINUOUS. MINIMUM WELD
<br /> OR INSTALLED INWETRENCHES SHALL BE FABRICATED OF STAINLESS STEEL, OR SHALLWEATHER
<br /> BACKWfELDED AFTER HYDROIESf, DEPTH, OR LEG OF FILLET WELD: EQUAL TO THICKNESS OF THE THINNEST MEMBER M :,S AS NEEDED 70 COMPLETE ALL CHECKOUT, COMMISSIONING AND TESTING WORK, 74.00, 10. 10 SHOP AND FIELD PRESSURE TESTING OF PIPING SYSTEMS
<br /> BE CARBON STEEL, HOT-DIPPED GALVANIZED AFTER FABRICATION, WELDED, 10, CONTRACTOR SHALL FURNISH EQUIPMENT AND APPARATUS NECESSARY FOR PIPING.
<br /> 8. PROVIDE PIPE HANGERS, SUPPORTS, AND INSERTS CONFORMING TO: SHELL DESIGN AND i 1 . GROUP PIPING WHEREVER PRACTICAL AT COMMON ELEVATIONS. INSTALL PIPING TO PRESSURE TESTS, CORRECT DEFECTS DISCLOSED BY THE TESTS AT NO COST TO OWNER, COR ADDITIONAL REQUIREMENTS, REFER TO PROJECT SPECIFICATIONS.
<br /> ENGINEERING PRACTICES (DEPS), CONSERVE SPACE AND NOT INTERFERE WITH USE OF SPACE BY OTHER WORK, 39, DO NOT USE POWDER ACTUATED ANCHORS. DO NOT CU,T OR WELD TO ANY STRUCTURAL AND, CONDUCT TESTS IN THE PRESENCE OF THE OWNER,
<br /> MEMBER UNLESS SHOWN ON THE DRAWINGS OR APPROVED BY THE OWNER.
<br /> 12. USE FITTINGS ONLY FOR CHANGES IN DIRECTIONS ON RIGID PIPE AND HARD DRAWN - 11 . TEST PIPING SYSTEMS AFTER THE LINES HAVE BEEN CLEANED AND BEFORE REQUIRED BY PAINIING
<br /> 9, PROVIDE PIPE HANGERS, SUPpPORTS, AND ACCESSORIES WHICH: PERMIT VERTICAL TUBING. DO NOT USE BUSHINGS, CLOSE NIPPLES, OR STREET ELLS, MITERED FITTINGS ARE 40, USE CONCRETE ANCHORS WHERE NECESSARY TO RAN'G , PIPING OR EQUIPMENT FROM 1 , NEW. (UNCOATED) STEEL PIPE & STRUCTURAL STEEL SHOP APPLIED: PREPARE ALL
<br /> ADJUSTMENT AFTER INSTALLATION OF PIPING, ARE DESIGNED FOR SUPPORT OF PIPING AND NOT ALLOWED, STANDARD ELBOW FITTINGS MAY BE SEGMENTED AS NECESSARY TO OBTAIN CONCRETE SLABS OR WALLS AS DETAILED ON THE DRAWINGS OR FOR FASTENING THE OWNER. INSULATION OR COVERING HAS BEEN APPLIED. SURFACES, PRIME AND PANT IN ACCORDANCE WITH SHELL SPECIFICATIONS IN PROJECT
<br /> COMPONENTS UNDER ALL CONDITIONS OF OPERATION, ATJD WILL NOT CRUSH, INDENT, OR REQUEST FOR QUOTATION.
<br /> OTHERWISE DAMAGE PIPE, PIPING INSTALLATION OR JACKETING. REQUIRED ANGLE. ATTACHMENTS LESS THAN 400 POUNDS TQ NEW CONCRETE WALLS AND FLOOR SLABS ON 12. REMOVE OR VALVE-OFF FROM THE SYSTEM GAUGES, TRAPS AND OTHER APPARATUS THAT
<br /> GRADE ATTACHING ANY TYPE OF ANCHOR 10 ELEVATED CONCRETE SLABS OR DECKING IS MAy BE DAMAGED BY THE PIPING TEST PRESSURE INCLUDING: ROTATING MAACHINERY, SUCH
<br /> 13. PROVIDE A UNION OR FLANGpS AT EACH FIRING CONNECTION TO EQUIPMENT OR NOT ALLOWED, UNLESS INDICATED ON THE STRUCTURAL DESIGN DRAWINGS. AS PUMPS AND COMPRESSORS; PRESSURE; RELIEVING DEVICES, SUCH AS RUPTURE DISCS 2. EXISTING (PREVIOUSLY COATED) STEEL PIPE AND FIELD JOINTS: PREPARE ALL SURFACES,
<br /> 10, PROWDE COMPLETE HANGER AND SUPPORT ASSEMBLIES, INCLUDING CLAMPS, CLEVISES, INSTRUMENTATION ON THE DOWNSTREAM SIDE OF EACH STOP VALVE TO FACILITATE - ANq PRESSURE RELIEF VALVES; VESSELS THAT DO NOT SATISFY TEST CONDTIONS OF THE PRIME AND PAINT IN ACCORDANCE WITH SHELL SPECIFICATIONS IN PROJECT REQUEST FOR
<br /> STRUCTURAL ATTACHMENITS, RODS AND PIPE ROLLS, CONSTRUCTED FOR CO,dPADBWTY ViITH N QUOTATION,
<br /> ITEMS SUPPORTED, INSTALLATION AND REMOVAL, 41 , INSTALL ANCHORS IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS. DO NOT EXCEED PIPI G TEST; AND ALL VESSELS REGARDLESS OF RATING WHEN USING GAS PRESSURE FOR
<br /> RATED LOAD, USE A MINIMUM OF TWO BOLTS TO ATTACH EACH ITEM: SIZE AND SPACING TESTING; LOCALLY MOUNTED PRESSURE INDICATING GAUGES, WHERE THE TEST PRESSURE
<br /> 11 . PROVIDE ALL SIMILAR SUPPORT COMPONENTS BY SAME lAANUFACTURER. 14. ALL UNIONS ANN FLANGES MUST BE ACCESSIBLE FOR MAINTENANCE; DO NOT INSTALL TO BE APPROVED BY SUBMITTAL WOULD EX
<br /> THEIR SCALE RANGE; IN-LINE INSTRUMENTATION, UNLESS OTHERWISE Q1ypFESSIp
<br /> UNIONS OR FLANGES IN BURIED PIPING OR IN AREAS WHICH DO NOT HAVE DIRECT � SPECIFIED. �`� '( • H00� F
<br /> 12. ALL PIPING SHALL, BE SUPPORTED WITH SEISMIC RESIRAMS IN ACCORDANCE WITH THE ACCESS. 42. LOCATE AND INSTALL SUPPORTS. IN ACCORDANCE WITH SHELL DEPS AND AS REQUIRED TO J`�' 61
<br /> OMIT MAXIMUM PIPE DEFLECTION TO 0, 1 INCH WHEN FILLED WITH WATER AND SO AS NOT 13, CONTRACTOR SHALL SUBMIT CALIBRATION RECORDS FOR GAUGES USED FOR TESTING TO
<br /> AMERICAN SOCIETY OF CIVIL ENGINEERS $TANDARD, ASCE 7- 10, CHAPTER 13, SEISMIC 15. ALLOW SUFFICIENT CLEARANCE FOR ACCESS TO VALVES, EQUIPMENT, AND WALKWAYS. TO INDUCE EXCESSIVE CONCENTRATED LOADS, OWNER, M 384461
<br /> DESIGN REQUIREMENTS FOR NON STRUCTURAL COMPONENTS.
<br /> 13. PROVIDE MIISCEjJ.AtJEOUS STRUCTURAL MEMBERS AS REQUIRED FOR FINISHED INSTALLATION 16, CONNECT PIPING TO EQUIRIEM ONLY AFTER THE EQUIPMENT HAS BEEN SECURELY 43, UNLESS SPECIFICALLY INDICATED, DO NOT USE FLOOR STANDS, HANGERS, AND SUPPORTS 14, TWO PRESSURE GAUGES ARE REQUIRED PER TESTING SYSTEM. LOCATE GAUGES AS CLOSE
<br /> OF HANGERS AND SUPPORTS. ANCHORED, LEVELED, AND ALIGNED IN PLACE. INSTALLED OR USED BY OTHER CONSTRUCTION TRADES, AS POSSIBLE TO THE HIGH POINT OF THE PIPING SYSTEM. JT ��"GHANIOP�
<br /> 14. ALL BOLTED CONNECTIONS IN SUPPORTS FOR PIPING MATERIALS SHALL USE ASTM A 307 171 INSTALL PIPING SO THAT NO LOAD OR MOVEMENT IN EXCESS OF THAT STIPULATED BY 44. LOCATE SUPPORTS FOR HORIZONTAL PIPING AS DETALED ON PROJECT DRAWINGS, SMALL 15, VENTS AND OTHER CONNECTIONS THAT CAN SERVE AS VENTS DURING FILLING SHALL BE ATFOF ' CA0
<br /> GRAPE B BOLTS AND NUTS IN THE SIZES LISTED ON THE DRA441NG; UNLESS SPECIFICALLY EQUIPMENT MANUFACTURER WILL BE IMPOSED UPON FOULPMEM CONNECTION, INSTALL BORE OR FIELD ROUTED PIPING SHALL BE SUPPORTED PER SHELL STANDARD DEP OPENED SO THAT NR IS VENTED BEFORE APPLYING TEST PRESSURE TO A SYSTEM.
<br /> NOTED OTHERtWSE, PIPING TO ALLOW FOR CONTRACTION AND EXPANSION W OM STRESSING PIPE, JOINTS, 31 .38,01 . 11 -CEN APPENDIX E, p�
<br /> OR CONNECTED EQUIPMENT, 16, UNLESS DIRECTED OTHERWISE, HYDROSTATICALLY TEST PIPING SYSTEMS AT A PRESSURE OF ISSUED FOR
<br /> 45, AT CHANGES IN DIRECTION, LENGTH OF PIPE BETWEEN SUPPORTS SHALL NOT EXCEED 75% 1 ,5 TIMES THE SPECIFIED DESIGN PRESSURE, ALL TESTING PER THE REQUIREMENTS OF
<br /> 15, CONCRETE ANCHORS USED FOR MOUNTING PIPE SUPPORTS, PIPING SPECIALTIES, ETC.
<br /> SHALL BE HAAILTHO APPROVED EQUAL 18. INSTALL PIPE WITHOUT SPRINGING OR FORCING. OF TABLE VALUES. ASME 831 .4. CON p RUCTION
<br /> 16. PIPE PAINTING AND NARKING SHALL CONFORM TO THE REQUIREMENTS OF PROJECT 19. MAKE SECONDARY BRANCHES OFF THE PRIMARY LINES WITH BUTT WEIR REDUCING TEE 46. INSTALL U-BOLTS AROUND PIPES AND BOLT TO STRUCTURAL SILL SUPPORTS WHERE 17. JOINTS AND CONNECTIONS SHALL BE EXAMINED FOR LEAKAGE WHILE THE PIPE IS ourdrlerenGe
<br /> NAMING SPECIFICATION, FITTINGS, WELDOLETS, SOCKOLETS OR THREADOLETS AS SPECIFIED IN THE PIPE INDICATED ON DRAWINGS. PRESSURIZED. THE PIPING SYSTEM SHALL SHOW NO VISUAL EVIDENCE OF WEEPING OR ' Is engineered,
<br /> SPECIFICATIONS, LEAKING. CORRECT VISIBLE LEAKAGE AT THE CONTRACTOR'S EXPENSE: rwrtr.haMsproup.com
<br /> PROJECT N0: 0Q16556.00
<br /> TRANSPORTATIO TERMINALS PIP NG
<br /> I
<br /> STOGKTON - SAN dQ , QUIT COUNTY GENERA NOTES
<br /> THIS DOCUMEPf� IS CONFIDEIYIIAL AND R I3HALL NOT BE REPRODUCED OR
<br /> REDISTRIBUTED WITHOUT PRIOR PERMISSION, NEITHER THE OPERATOR NOR THE OWNER
<br /> 0 ' 07/ 12/19 ISSUED FOR CONSTRUCTION - CONTACT WATER SYSTEM UG-5 REMOVAL HG DTH l.+A10E At19 WARRANTY AS TO THE CORRECTNESS OR COMPLETENESS OF THE INFORMATION smi NONE 'OA1E neiaiou
<br /> Esc DTH CONTAINED ON THIS DRAWING, AND THE US,? ASSUMES ALL RISK OF LOSS TO P-ool O
<br /> RET' RATE DESpRIPnON OF REVISION ES N0. BY EIEC MECH APP REV DATE OESCRIPTION . OF REVISION E5 NO. �' APP, , PERSONS ,AND PROPEFOY lS A RESULT, OF RELIt�'CE THEREON., IXL.NH RRK 7/,12/1 B